<strong>12</strong>. GENERAL SERVICES<br />

<strong>12</strong>.1 PRINTING AND STATIONERY<br />

On Going Schemes<br />

<strong>State</strong> Funded Schemes<br />

PTS-1 Modernization of <strong>Punjab</strong> Government Presses<br />

524<br />

Outlay – Rs. 200.00 lac<br />

<strong>12</strong>.1.1 There are two Government Presses situated at Mohali and Patiala and for<br />

modernization of these presses an amount of Rs. 426.85 lac for 11 th Five Year Plan has been<br />

earmarked. No expenditure was incurred during 2007-08. Against the token provision of Rs.<br />

1.00 lac an amount of Rs. 155.00 lac was released to the Department during 2008-09 for<br />

modernization of Govt. Press at SAS Nagar but no expenditure was incurred due to non-<br />

release of funds. An outlay of Rs. 155.00 lac was provided under the scheme for 2009-10 but<br />

no expenditure was incurred during this year. An outlay of Rs. 137.11 lac is provided in the<br />

Annual Plan 2010-11 against which an outlay of Rs. 200.00 lac is provided for machinery<br />

and operational staff for the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

PTS-2 Construction of Parallel Block to Existing Block and Staff Quarters at<br />

Govt. press S.A.S. Nagar(Mohali)<br />

Outlay - Rs. 0.00 lac<br />

<strong>12</strong>.1.2 An outlay of Rs. 20.00 lac was provided for the 10 th Five Year Plan for the<br />

installation of grills, connecting passages and barbed wire at the Govt. Press, S.A.S. Nagar,<br />

Mohali. No expenditure was incurred during the year 10 th Five Year Plan. An outlay of Rs.<br />

5.00 lac has been provided in the 11 th Five Year Plan. No expenditure was incurred during<br />

2007-08 and 2008-09. An outlay of Rs. 22.49 lac was provided for Annual Plan 2009-10<br />

against which no expenditure was be incurred. An outlay of Rs. 5.00 lac is provided in the<br />

Annual Plan 2010-11 against which an expenditure of Rs. 22.47 lac has been incurred.<br />

However, no outlay has been provided during <strong>2011</strong>-<strong>12</strong> for this purpose.<br />

PTS-3 Construction of Building and other Important Works at Government<br />

Press Patiala<br />

Outlay –Rs. 26.44 lac<br />

<strong>12</strong>.1.3 The Government Press, Patiala requires upgradation i.e. construction of<br />

covered hall for storing of cutting and waste paper of printed material and installation of new<br />

tubewell. An outlay of Rs. 49.39 lac has been provided in the 11 th Five Year Plan. An outlay