9.4.14 An outlay of Rs. 200.00 lac is provided for the 11 th<br />

Plan. An expenditure of<br />

Rs. 40.00 lac, Rs. 38.01 lac and Rs. 38.89 lac was incurred during 2007-08, 2008-09 and<br />

2009-10 respectively. Since 2009-10 was the last year of the <strong>12</strong> th Finance Commission, no<br />

outlay is provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

FT-1 Externally-Aided Forestry Development Project<br />

270<br />

Outlay – NIL<br />

9.4.15 The Project was being implemented in the state with the assistance of JICA<br />

(Japan International Cooperation Agency). The operational period for this project was 8 years<br />

i.e. from 1997-98 to 2004-05 and was extended up to 31-7-2009. The original project cost<br />

was Rs. 408.10 crore against which an amount of Rs. 250.81 crore and Rs.266.17 crore was<br />

spent during first trench up to 30-11-2002 and second trench from 1-<strong>12</strong>-2002 to 31-7-2009<br />

respectively.<br />

9.4.16 The aim of the project was to improve the production of fuel wood, small<br />

timber, fuel, fodder, live stock and reduce floods in the plain areas. Under this project<br />

79564 ha. area was treated through afforestation activities. The other activities covered under<br />

the project were soil conservation works in Shiwalik Hills such as construction of silt<br />

retention dams, water harvesting structures etc, which would conserve soil and moisture both<br />

in arable and non arable lands, improve ground water recharge and increase the productivity<br />

of land, forest protection and fire control through joint forest management forest extension,<br />

and research activities and implementing the GIS/MIS system in the department. A forest<br />

complex building is also being constructed at Mohali under this project.<br />

9.4.17 Under this project an amount of Rs 250.81 crore and Rs. 266.17 crore was<br />

utilized upto 31-7-2009 during first trench and second trench respectively out of which an<br />

amount of Rs. 231.80 crore and Rs. 195.48 crore respectively was reimbursed from the<br />

funding Agency through Government of India to <strong>Punjab</strong> <strong>State</strong>. An expenditure of Rs 27.79<br />

crore had been incurred during 2009-10, of which Rs 15.62 crore was reimbursed by JICA<br />

and balance non-reimbursable amount of Rs <strong>12</strong>.17 crore was utilized to wind-up the project.<br />

Since project was completed by 31/7/2009, no outlay is provided for the Annual Plan <strong>2011</strong>-<br />