15.12.2012 Views

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

student from class +1 and +2 is charged per month. However, no fee is to be charged from<br />

girl students from the year <strong>2011</strong>-<strong>12</strong> on wards.<br />

13.20 An outlay of Rs 22385.56 lac is provided for the 11 th Five Year Plan. An<br />

expenditure of Rs. 3439.00 lac, Rs. 3433.00 lac and Rs. 2675.00 lac and Rs.4280.20 lac was<br />

incurred during the year 2007-08, 2008-09, 2009-10 and 2010-11 respectively. An outlay of<br />

Rs. 3500.00 lac is provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

EDS-8 Opening of Adarsh Schools in each Block of the <strong>State</strong><br />

557<br />

Outlay- Rs 1.00 lac<br />

13.21 The state government has taken a major initiative to set up <strong>12</strong>6 Adarsh<br />

schools, one each in Assembly Constituency in collaboration with the private sector. These<br />

Adarsh schools will be located in an area of 10-15 acres of land, the land provided could be<br />

as high as 25 acres. The capital cost would be Rs. 7.50 crore which shall be met on 50:50<br />

basis between state government and private partners. However, the state government’s<br />

contribution per school shall be maximum of Rs. 3.75 crore or 50% which ever is less. The<br />

operational cost of an Adarsh school with about 2000 students with a cap of Rs. 1600 per<br />

student shall be shared on 70:30 basis between state government and private partners. The<br />

school would be required to obtain necessary affiliation with the CBSE and any other<br />

permission that might be required from competent authority. No fee is charged from the<br />

students.<br />

13.22 15 Adarsh Schools are already been made functional,52 sites have been<br />

allotted to various corporate house,41 MoUs have been signed and construction work has<br />

begun on 15 sites. Funds under the scheme are to be provided by <strong>Punjab</strong> Educational<br />

Development <strong>Board</strong>, therefore, a token provision of Rs. 1.00 lac is made for the Annual Plan<br />

<strong>2011</strong>-<strong>12</strong>.<br />

URBAN DEVELOPMENT<br />

UD-2 Swaran Jayanti Shehari Rojgar Yojana (75:25)<br />

Outlay -Rs.100.00 lac<br />

13.23 This scheme has been designed to alleviate the index of poverty in the urban<br />

settlements of the <strong>State</strong> by way of providing opportunities in Self Employment to the poor

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!