CS (FC)-2 Construction of Flood Protection and Drainage Works (100% CSS).<br />

181<br />

Outlay - Rs.750.00 lac<br />

5.1.73 This scheme was started during the year 1983-84. Under this scheme the<br />

funds are provided for the execution of emergent flood protection works along international<br />

border to divert the flow of river Sutluj away from Indian side. This scheme is approved by<br />

the Ministry of Water Resources, Government of India, As per practice in vogue the<br />

Remedial Committee constituted by Central Water Commission proposes the funds after<br />

visiting the site. The 31st Remedial Committee has already visited the site during January<br />

<strong>2011</strong> and has recommended 16 No. emergent works costing Rs. 596.92 lac. Works will be<br />

started after receipt of funds. Expenditure incurred during 2009-10 was Rs. 185.00 lac. An<br />

outlay of Rs. 1000.00 lac was provided during 2010-11 however no funds were released by<br />

Government of India. An outlay of Rs. 750.00 lac is provided for the scheme as GoI share in<br />

the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

CS (FC)-6 Counter Protective Measures on left side of river Ravi (100% CSS).<br />

Outlay - Rs.750.00 lac<br />

5.1.74 This scheme was started during the year 1997-98. Under this scheme funds<br />

are provided by Government of India for emergent flood protection works along international<br />

border for defense security purposes. This scheme is approved by Ministry of Home Affairs,<br />

Government of India. As per practice in vogue the Remedial Committee (constituted by<br />

Ministry of Home Affairs) proposes funds after field visits at sites. The 31st Remedial<br />

Committee has already visited the site during January <strong>2011</strong> and has recommended 25 No.<br />

emergent works costing Rs. 1826.57 lac. Works will be started after receipt of funds.<br />

Expenditure incurred during 2009-10 was Rs. 194.83 lac. An outlay of Rs. 1000.00 lac was<br />

provided during 2010-11, however no funds were released by Government of India. An<br />

outlay of Rs. 750.00 lac is provided for the scheme in the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

*****