15.12.2012 Views

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SN Item Position during Position during Target<br />

2006-09 2010-11 <strong>2011</strong>-<strong>12</strong><br />

B. Large/Medium Sector<br />

1. Units (Working) 340 425 450<br />

2. Employment(Nos.) 199342 235000 250000<br />

3. Fixed Investment(Rs.Cr.) 23286 40000 45000<br />

4. Production(Rs. Cr.) 40493 82000 95000<br />

5. Export (Rs. Cr.) 4701 6800 8000<br />

Total<br />

(A+B)<br />

Industrial Sector<br />

1. Units (Working) 191979 168425 170950<br />

2. Employment(Nos.) 1138026 <strong>12</strong>55000 <strong>12</strong>90000<br />

3. Fixed Investment(Rs.Cr.) 28789 48600 54000<br />

4. Production(Rs. Cr.) 73766 136000 155000<br />

5. Export (Rs. Cr) 11798 17000 20000<br />

The scheme-wise detail is given as under :<br />

On Going Schemes<br />

<strong>State</strong> Funded Schemes<br />

Village and Small Scale Industries:<br />

VSI-1 Central Institute of Hand Tools, Jalandhar (pending liability of<br />

repayment of loan of GOI)<br />

Outlay - Rs. 140.00 lac<br />

7.4 Central Institute of Handtools Jalandhar was set up in 1983 by Government of<br />

India with UNDP assistance. Land for the building of this Institute was provided by the <strong>State</strong><br />

Government. A piece of land measuring 5 kanal 19 marlas adjoining to this building was<br />

left out and purchased in 2001 for construction of hostel building for the trainees through<br />

borrowing a loan amounting to about Rs. <strong>12</strong>8.00 lac from Government of India. This loan<br />

amount is to be repaid. An outlay of Rs. 130.00 lac is provided for the 11 th Five Year Plan<br />

(2007-<strong>12</strong>). No expenditure could be incurred under this scheme during the year 2009-10.<br />

To repay this loan of Rs. 111.00 lac to GoI and to make payment of cost of land to the owner,<br />

an amount of Rs. 140.00 lac is provided during the year <strong>2011</strong>-<strong>12</strong>.<br />

VSI-2 Participation in <strong>Punjab</strong> Trade Pavilion at New Delhi through PSIEC<br />

Outlay- Rs.60.00 lac<br />

7.5 The Indian international trade fair, an annual feature, is held at Pragati<br />

Maidan, New Delhi for two weeks. <strong>Punjab</strong> Small Industries & Export Corporation (PSIEC)<br />

participate in this fair in a most professional and commercial way. An outlay of Rs. 150.00<br />

lac is provided for the 11 th Five Year Plan (2007-<strong>12</strong>).<br />

7.6 No expenditure was incurred during the year 2009-10 and 2010-11. An outlay<br />

of Rs. 60.00 lakhs is provided during the year <strong>2011</strong>-<strong>12</strong>.<br />

201

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!