against which an expenditure of Rs. 7288.00 lac has been incurred. An outlay of Rs. 4000.00<br />

lac has been provided in the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

(ii) UWS-9 Extension and Augmentation of Water Supply and Sewerage Scheme<br />

Moga<br />

414<br />

Outlay – Rs. 400.00 lac<br />

11.6.17 DPRs for Rs. 4859.68 lac was prepared out of which PIDB has approved Rs.<br />

818.00 lac. An amount of Rs. 1.61 crore was released by PIDB in 2008-09 and the same was<br />

released to <strong>Punjab</strong> Water Supply & Sewerage <strong>Board</strong>. An expenditure of Rs. 161.00 lac was<br />

incurred under the scheme. During 2009-10, an amount of Rs. 618.00 lac was provided for<br />

taking up sewerage works in Moga against which an expenditure of Rs. 207.17 lac was<br />

incurred and an outlay of Rs. 400.00 lac is provided in the Annual Plan 2010-<strong>2011</strong>.against<br />

which an expenditure of Rs. <strong>12</strong>2.14 lac has been incurred. However, an outlay of Rs. 400.00<br />

lac is provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

(iii) UWS-10 Water Supply, Sanitation and Sewerage Scheme for three religious<br />

towns at Sultanpur Lodhi, Dera Baba Nanak & Chamkaur Sahib.<br />

Outlay –Rs. 1000 .00 lac<br />

11.6.18 The total estimated cost of Sultanpur Lodhi project is Rs. 10.00 crore and<br />

work was started during 2009 and completion year is 2010. During 2009-10, PIDB has<br />

released Rs. 653.00 lac for taking up water supply and sanitation & sewerage works at<br />

Sultanpur Lodhi. An amount of Rs. 653.00 lac was provided in the Annual Plan 2009-10 for<br />

Sultanpur Lodhi and an amount of Rs. 53.43 lac was incurred for this purpose during the<br />

year. Two new religious towns namely Chamkaur Sahib and Dera Baba Nanak has also been<br />

included during 2009-10 with an estimated cost of Rs. 11.55 crore & Rs. 7.38 crore. For<br />

three religious towns, an outlay of Rs. 400.00 lac is provided in the Annual Plan 2010-<strong>2011</strong><br />

against which an expenditure of Rs. 1093.18 lac has been incurred. An outlay of Rs. 1000.00<br />

lac is provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

.<br />

(iv) UWS-11 Water Supply and Sanitation & Sewerage Scheme at Patti<br />

Outlay –Rs. 500 .00 lac<br />

11.6.19 DPRs for Rs. 20.70 crore was prepared for providing water supply, sanitation<br />

and sewerage at Patti against which PIDB has sanctioned Rs. 9.91 crore. During 2009-10,<br />

PIDB has released Rs. 891.00 lac for taking up water supply and sanitation & sewerage