made for this scheme in the Annual Plan 2008-09 against which an expenditure of Rs. 1.91<br />

lac had been incurred. A token provision of Rs. 0.10 lac was made during 2009-10 and<br />

2010-11. A token provision of Rs. 0.10 lac is again made in the Annual Plan <strong>2011</strong>-<strong>12</strong> as the<br />

cards will be printed when the next survey is carried out.<br />

RDO(S)-7 Environmental improvement of SC basties/villages with stress on<br />

sanitation<br />

145<br />

Outlay – Rs. 0.10 lac<br />

3.33 People living in the villages especially belonging to poor and weaker sections<br />

of the society have to go to ease themselves in an open space. This activity is not good for<br />

health and environment, besides it is also against the honour of the women and children.<br />

Generally the people of the scheduled castes and scheduled tribes are facing this problem due<br />

to the fact that there is no land of their own. Government of India had sanctioned one time<br />

ACA of Rs. 20.00 crore for the ‘Environmental improvement of SC basties/villages with<br />

stress on sanitation’ during 2003-04. This ACA could not be released and no expenditure was<br />

incurred upto March 2007. An outlay of Rs. 2000.00 lac has been provided for this scheme<br />

for the 11 th Five Year Plan. Against an allocation of Rs. 2000.00 lac as one time ACA<br />

released by Government of India, an expenditure of Rs. 718.83 lac was incurred under this<br />

scheme during 2007-08 and toilets were constructed @ of Rs. 7800/ per unit. An outlay of<br />

Rs. 500.00 lac was provided for this scheme in the Annual Plan 2008-09 against which an<br />

expenditure of Rs. 161.82 lac had been incurred.<br />

3.34 The guidelines of the scheme have been revised from 2009-10 and the cost of<br />

construction per unit will be Rs. 10,000/- and the amount will be utilized for the construction<br />

of toilets only in the households belonging to scheduled castes families. An outlay of Rs.<br />

1<strong>12</strong>0.00 lac was provided for this scheme in the Annual Plan 2009-10 to clear the backlog of<br />

ACA of 2003-04 against which an expenditure of Rs. 583.00 lac was incurred during 2009-<br />

10. A token provision of Rs. 0.10 lac was provided in the Annual Plan 2010-11 against which<br />

an expenditure of Rs. 536.25 lac was incurred. A token provision of Rs. 0.10 lac is made in<br />

the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

RDO(S)-6 For incomplete sewerage systems in villages<br />

3.35 The <strong>State</strong> Government launched a scheme for completion of sewerage<br />

systems in villages for which an outlay of Rs. 400.00 lac was provided during the year 2006-<br />

07, however, the amount could not be drawn during that year. An outlay of Rs. 1000.00 lac