15.12.2012 Views

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PM-2 Strengthening of <strong>Planning</strong> Machinery in the <strong>State</strong><br />

279<br />

Outlay – Rs. 378.00 lac<br />

10.1.8 The <strong>Punjab</strong> <strong>State</strong> <strong>Planning</strong> <strong>Board</strong> came into existence in the year 1972. In<br />

order to formulate and monitor the <strong>State</strong> Plan more efficiently, the <strong>Planning</strong> machinery in the<br />

state was strengthened. The posts already sanctioned under this scheme will be carried over<br />

to the year <strong>2011</strong>-<strong>12</strong>.<br />

10.1.9 An outlay of Rs. 400.00 lac is provided for the 11 th Five Year Plan. An<br />

amount of Rs. 99.77 lac was incurred during 2010-11. An outlay of Rs. 378.00 lac is<br />

provided in the Annual Plan <strong>2011</strong>-<strong>12</strong> for salary, office expenses, other administrative<br />

expenses, advertising and publicity and other charges etc.<br />

PM-3 Computer Cell of <strong>Punjab</strong> <strong>State</strong> <strong>Planning</strong> <strong>Board</strong> (Staff, Equipment and<br />

Consumables etc.)<br />

Outlay -Rs. 28.10 lac<br />

10.1.10 An outlay of Rs. 100.00 lac is provided for the 11 th Five Year Plan. An<br />

amount of Rs.6.64 lac was incurred during 2010-11. An outlay of Rs. 28.10 lac is provided in<br />

the Annual Plan <strong>2011</strong>-<strong>12</strong> for the salary of the staff, purchase of equipments consumables.<br />

PM-4 <strong>State</strong> Independent Evaluation Facility<br />

(Consultancy Services/ Seminars / Pilot Study/Quick Survey of Plan<br />

Projects/Schemes of the Department - Renamed)<br />

Outlay – Rs. 50.00 lac<br />

10.1.11 Under this scheme technical consultancy is provided for formulating block<br />

level/grass root plans. It is also envisaged to engage consultants for modification of plan<br />

schemes. Seminars/ workshops are held under this scheme for giving new directions to this<br />

concept. Various studies on pilot basis were entrusted to various research organizations<br />

working within the state and outside.<br />

10.1.<strong>12</strong> An outlay of Rs. 300.00 lac is provided for the 11 th Five Year Plan. An<br />

amount of Rs. 15.62 lac was incurred during 2010-11. An outlay of Rs. 50.00 lac is provided<br />

for Annual Plan <strong>2011</strong>-<strong>12</strong>.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!