15.12.2012 Views

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sr.<br />

No.<br />

MAJOR EPC INFRASTRUCTURE PROJECTS BEING FACILITATED<br />

BY THE PUNJAB INFRASTRUCTURE DEVELOPMENT BOARD<br />

(PIDB)<br />

INFRASTRUCTURE SECTORS<br />

221<br />

EST.<br />

COST<br />

(Rs. In<br />

Cr.)<br />

DATE<br />

OF<br />

START<br />

DATE<br />

OF<br />

COMP<br />

LETIO<br />

N<br />

FUNDS<br />

RELEASED<br />

(AS ON<br />

31.<strong>12</strong>.10)<br />

21 Road to Bathinda Refinery 11.15 - 2001 10.63<br />

22<br />

23<br />

4-lanning of Patiala-Sirhind road<br />

from Gurudwara Dukh Niwaran<br />

Sahib to village Baran<br />

Widening of approach road to Attari<br />

Railway Station<br />

10.00 2004 2006 9.81<br />

2.00 1.58<br />

24<br />

Four lanning of Patiala – Sangrur<br />

road (Sewa singh Thikriwala Chowk<br />

to Samana crossing up to BML<br />

Canal)<br />

20.00 2006 2008 16.85<br />

25 Upgradation of Plan roads <strong>12</strong>0.00 - - 107.95<br />

26<br />

Approach road to railway stations at<br />

5.00 4.61<br />

27<br />

28<br />

29<br />

30<br />

31<br />

Kharar and Morinda<br />

Widening and Upgradation of Rural<br />

roads under PMGSY (Land<br />

Acquisition)<br />

Metalled road bypass around<br />

Chawendi Devi, Distt. Amritsar<br />

Kathunangal-Tahli Sahib Road, Distt.<br />

Amritsar<br />

Fatehgarh-Churian-Wadala-Kotla<br />

Gujjran road, Distt. Amritsar<br />

W/S road from Thikriwala Chowk to<br />

YPS Chowk, Patiala<br />

50.00 - - 50.00<br />

1.00 2009 2010 0.93<br />

15.23 2009 2010 13.50<br />

2.25 2009 2010 2.06<br />

1.25 1.25<br />

32 Ludhiana Flyover 2.34 2.34<br />

TOTAL 544.13 486.06<br />

II HIGH LEVEL BRIDGES<br />

1 HLB over Sutlej and 5 Minor Bridges 40.00 2001 2006 2.52<br />

2 HLB Jagroan- Nakodar road 20.00 2001 2007 1.49<br />

3 HLB Gurdaspur-Mukerain road 20.00 2001 2007 2.90<br />

4<br />

HLB across UBDC Canal (KBU<br />

5.00 2006 2007 4.54<br />

&MBU) on Gurdaspur - Mukerian<br />

5 Bridge over Patiala Ki Rao 5.00 2002 2005 3.93<br />

6 High Level Bridge over river Ravi 20.00 2005 2007 6.70<br />

7 Bridge over Lohand Khad 3.37 3.09<br />

8<br />

HLB over Sutlej river crossing at<br />

Sarai Ka Pattan, Ropar with toll<br />

based O&M<br />

50.00 2008 2010 42.50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!