15.12.2012 Views

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

closed. RSVY has been replaced with Backward Regions Grant Fund (BRGF) which has<br />

been shifted under sub-head Rural Development.<br />

PM 18 Untied funds of CM/Dy. CM/FM<br />

Outlay - Rs. 2000.00 lac<br />

15.18 Untied funds, kept mainly for creating capital assets of visible public utility<br />

are to be utilized on the basis of recommendations received from Hon’ble Chief Minister,<br />

Deputy Chief Minister and Finance Minister <strong>Punjab</strong> as per the guidelines (Annexure ‘B’).<br />

An outlay of Rs. 10000.00 lac had been provided for the 11 th Five Year Plan. An expenditure<br />

of Rs. 1337.54 lac and Rs. 1669.68 lac had been incurred during 2007-08 and 2008-09<br />

respectively. An expenditure of Rs.1018.55 lac had been incurred during 2009-10. An outlay<br />

of Rs.1500.00 lac had been provided in the Annual Plan 2010-11. Against the revised outlay<br />

of Rs. 1700.00 lac, an expenditure of Rs. 1697.22 lac was incurred during 2010-11. Under<br />

this scheme, an outlay of Rs. 2000.00 lac is provided in the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

PM 19 <strong>Punjab</strong> Nirman Programme (District Level)<br />

15.19 The <strong>State</strong> Government had launched a special project namely ‘<strong>Punjab</strong> Nirman<br />

Programme’ during 2005-06 for improving the living conditions of the people of <strong>Punjab</strong><br />

living in rural and urban areas. An amount of Rs. 0.10 lac was made in the Annual Plan<br />

2009-10. No outlay has been provided in the Annual Plan 2010-11. No outlay is provided in<br />

the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

PM 20 Untied Funds of DPCs<br />

Outlay – Rs. 4000.00 lac<br />

15.20 As the guidelines of the <strong>Planning</strong> Commission have laid a major stress on<br />

devolution of adequate funds at the district level in an untied manner, an outlay of Rs.<br />

4000.00 lac was provided in the Annual Plan 2009-10 which was revised to Rs. 200.00 lac.<br />

No expenditure was incurred during 2009-10. An outlay of Rs. 2000.00 lac had been<br />

provided in the Annual Plan 2010-11. An expenditure of Rs. 988.62 lac was incurred during<br />

2010-11. An outlay of Rs. 4000.00 lac is provided in the Annual Plan <strong>2011</strong>-<strong>12</strong> to be placed<br />

at the disposal of the District <strong>Planning</strong> Committees for taking up small development works<br />

keeping in view the felt needs of the people and priorities of the district and also for<br />

filling up missing/critical gaps. District - wise distribution of these funds would be made on<br />

the basis of population.<br />

584

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!