V Tourism<br />

Development of Tourist infrastructure in the <strong>State</strong> to be funded by ADB<br />

(ADB 70:30 <strong>State</strong>)<br />

Outlay- Rs. 1800.00 lac<br />

14.14 The Department of Tourism has a plan to develop the tourist infrastructure in<br />

the state with the assistance of Asian Development Bank (ADB). The total cost of this project<br />

is Rs 398.40 crore. 70% cost which comes to about Rs 278.88 crore would be funded by<br />

ADB as a loan and the state is required to contribute 30% of the total cost which comes to<br />

about Rs 119.52 crore. The total requirement to be contributed by the state over a period of<br />

four years starting from 2009-10 to 2013-14 would be around Rs 40.00 crore per annum. The<br />

breakup of the project is as under:-<br />

SN Districts Total Outlay for<br />

ADB funding<br />

574<br />

Contribution of the <strong>State</strong><br />

Govt.(30% of the outlay)<br />

1 Amritsar <strong>12</strong>5.61 37.68<br />

2 Gurdaspur 24.13 7.24<br />

3 Patiala 116.70 35.01<br />

4 Ropar 75.56 22.67<br />

5 Mohali <strong>12</strong>.05 3.61<br />

6 Kapurthala 44.35 13.31<br />

Total 398.40 119.52<br />

An outlay of Rs 1800.00 lac is provided in the Annual Plan <strong>2011</strong>-<strong>12</strong>..<br />

Forestry and Wild Life (Completed)<br />

VI. Externally-Aided Forestry Development Project<br />

Outlay : NIL<br />

14.15 The project was being implemented in the state with the assistance of JICA<br />

(Japan International Cooperation Agency). The operational period for this project was 8<br />

years i.e. from 1997-98 to 2004-05 and was extended up to 31-7-2009. The original project<br />

cost was Rs. 408.10 crore against which an amount of Rs 250.81 crore and Rs.290.46 crore<br />

was spent during first trench up to 30-11-2002 and second trench from 1-<strong>12</strong>-2002 to<br />

31-7-2009 respectively.<br />

14.16 The aim of the project was to improve the production of fuel wood, small<br />

timber, fuel, fodder, live stock and reduce floods in the plain areas. Under this project