15.12.2012 Views

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sr.<br />

No.<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

11<br />

11<br />

1<br />

MAJOR EPC INFRASTRUCTURE PROJECTS BEING FACILITATED<br />

BY THE PUNJAB INFRASTRUCTURE DEVELOPMENT BOARD<br />

(PIDB)<br />

INFRASTRUCTURE SECTORS<br />

233<br />

EST.<br />

COST<br />

(Rs. In<br />

Cr.)<br />

DATE<br />

OF<br />

START<br />

PIPELINE : Rs. 1746.49 Cr. (<strong>AP</strong>PROX.)<br />

DATE<br />

OF<br />

COMP<br />

LETIO<br />

N<br />

FUNDS<br />

RELEASED<br />

(AS ON<br />

31.<strong>12</strong>.10)<br />

ROADS / BYPASSES<br />

Ropar – Balachaur –Nawanshahar –<br />

Banga – Phagwara road from 2-lane<br />

to 4-lane divided carriageway with<br />

subsequent O & M contract<br />

700.00 <strong>2011</strong> 20<strong>12</strong> -<br />

Approach roads to bridge at Bhangi<br />

Choe, Distt. Hoshiarpur<br />

3.00 2010 <strong>2011</strong> -<br />

Amritsar Tarn Taran Sarhali Harike<br />

road (MC Limit), Tarn Taran<br />

32.00 2010 <strong>2011</strong> -<br />

4-laning of road from Vallah Byepass<br />

to NH-1 to NH-15, Amritsar<br />

2010 <strong>2011</strong><br />

2-laning of road from NH-15 to 37.79<br />

-<br />

Amritsar-Bhikiwind<br />

road, Amritsar<br />

Khemkaran<br />

2010 <strong>2011</strong><br />

Amritsar-Ajnala road (NH-25)<br />

(Section Bypass to Airport road),<br />

Amritsar<br />

54.99 2010 <strong>2011</strong> -<br />

Upradation of road signages on<br />

various roads<br />

Road along Sabrahon Canal (section<br />

9.00 2010 <strong>2011</strong> -<br />

Khadoor Sahib -Goindwal crossing to<br />

village Fatehabad)<br />

5.54 2010 <strong>2011</strong> -<br />

4-laning of NH-1 (Beas) to Batala<br />

road (3.15 km)<br />

6.44 2010 <strong>2011</strong> -<br />

Bebe Nanki Marg Kapurthala to<br />

Sultanpur Lodhi<br />

34.00 2010 <strong>2011</strong> -<br />

Ring road Bathinda (Phase-II) (Sub<br />

Phase -II)<br />

Approach road to IIT Ropar (Ropar<br />

40.00 2010 <strong>2011</strong> -<br />

Byepass-1 with HLB over Sirhind<br />

Canal)<br />

86.00 2010 20<strong>12</strong> 0.01<br />

Approach road to IIT Ropar (Ropar<br />

Byepass-2)<br />

<strong>12</strong>2.00 2010 20<strong>12</strong> 0.02<br />

Total<br />

HIGH LEVEL BRIDGES<br />

Bridge over Chakki Nadi linking<br />

1,130.76 0.03<br />

NH-1A and NH-15 on EPC with toll<br />

based O&M<br />

40.00 <strong>2011</strong> 20<strong>12</strong> -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!