ecycled into the process of nearby dying industry. Thus, presently no effluent is discharged<br />

into Budha Nallah and subsequently into river Satluj.<br />

9.3.<strong>12</strong> The large/medium scale electroplating industries have already installed<br />

individual effluent treatment plants to achieve the standards prescribed by the <strong>Board</strong>. These<br />

industries have also provided RO plants to recover water and recovered water is reused in the<br />

process of the industry. These industries have been directed to install MEE to evaporate the<br />

R.O. rejects. After the installation of said system, there will be no discharge into Budha<br />

Nallah and subsequently into river Satluj.<br />

9.3.13 The <strong>Board</strong> has also issued directions to Municipal Corporation, Ludhiana to<br />

stop discharging treated or untreated sewage into Budha Nallah, so as to maintain the quality<br />

of water after treatment.<br />

9.3.14 Due to consistent efforts of the <strong>Board</strong>, the <strong>Punjab</strong> Water Supply and Sewerage<br />

<strong>Board</strong> has commissioned three sewage treatment plants of total capacity 311 mld for the<br />

treatment of sewage generated by Ludhiana city. The upgradation work of two STPs<br />

installed at village Bhattian and Balloke by 50 mld and 105 mld, respectively, is going on.<br />

With the upgradation of STP, the whole domestic waste water of Ludhiana will be treated.<br />

The <strong>Punjab</strong> Water Supply and Sewerage <strong>Board</strong> has also commissioned sewage treatment<br />

plants of 100 mld capacity for Jalandhar at village Pholariwala and also a 20 mld capacity<br />

STP has also been installed at Phagwara. STP of Jalandhar at Pholariwala is being expanded<br />

by 25 mld. The Departments of Soil Conservation and Irrigation have prepared schemes for<br />

utilization of treated effluent on the land for irrigation.<br />

9.3.15 To review the progress regarding cleaning of rivers and Budha Nallah, regular<br />

meetings are being held at the level of Hon’ble Chief Minister, <strong>Punjab</strong> from time to time.<br />

For establishing industrial zones separately for dyeing & electroplating units, which are<br />

required to be shifted from non-designated areas in Ludhiana, the suitable sites are being<br />

selected.<br />

9.3.16 During 2006-07, an amount of Rs. 100.00 lac was released for this purpose, out<br />

of the funds under <strong>Punjab</strong> Nirman Programme- state level initiative. An outlay of Rs.<br />

1369.03 lac is provided in the 11 th Five Year Plan. An expenditure of Rs. 480.00 lac and Rs.<br />

520.00 lac was incurred during 2007-08 and 2008-09 respectively. An outlay of Rs. 700.00<br />

lac was provided in the Annual Plan 2009-10. GoI has separately sanctioned an ACA of Rs.<br />

50.00 crore to Urban Welfare Department for Budha Nallah. Against an approved outlay of<br />

Rs. 1000.00 lac provided in 2010-11, a token provision of Rs. 1.00 lac is provided in the<br />

Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />