(8) Augmenting and strengthening of the transmission and distribution systems to<br />

supply proper quality of power in both urban as well as in rural areas.<br />

(9) Reduction of Aggregate Technical and Commercial (AT and C) losses.<br />

(10) Conservation of energy and load management.<br />

(11) Adoption of information technology in the power sector.<br />

6.1.3 Per capita consumption of electricity in the <strong>State</strong> has increased from 163 kwh<br />

in 1968 to <strong>12</strong>36 kwh in 2010-11 and accordingly electricity consumption has increased from<br />

700 million units to 46985.573 million units in 2010-11. At the national level per capita<br />

consumption of electricity is 411 kwh. The total installed capacity in 1967-68 was 614 MW<br />

which has increased to 6900 MW by the end of March, <strong>2011</strong>. All the <strong>12</strong>428 inhabited<br />

villages in the <strong>State</strong> have already been electrified. At present the number of consumers being<br />

served upto March, <strong>2011</strong> are 7320631 nos which includes general connections 6056471 nos,<br />

industrial connections 117844 nos, agriculture connections 1143267 nos and others<br />

connections 3049 nos in the <strong>State</strong>. In order to create employment/self employment<br />

opportunities and also to encourage agro based small scale industries in the rural areas,<br />

power supply on urban pattern has already been provided to 18866 villages including <strong>12</strong>428<br />

villages and 6438 deras and dhanies through independent feeders in the <strong>State</strong>. The total no of<br />

grid sub-stations is 775 and length of the transmission lines is 16424 Ckt. km as on<br />

31/3/<strong>2011</strong> besides this, the length of 11kv lines is 177419 Ckt km and LT lines is 164093 Ckt<br />

km. The transmission and distribution losses which were 30.82% in 1999-2000 have been<br />

brought down to 20.<strong>12</strong>% during 2009-10 which shows overall reduction of about 10.70%.<br />

6.1.4 An outlay of Rs. 5963.65 crore was approved in the 10 th Five Year Plan for<br />

power sector, the expenditure incurred during the corresponding period was Rs. 4928.89<br />

crore. The expenditure incurred during Ist three years of 11 th Five Year Plan was Rs. 4727<br />

crore, the financial performance is 81%. An expenditure of Rs. 2352.61 crore was incurred<br />

against the approved outlay of Rs. 3300.00 crore during 2010-11. The outlay provided for<br />

<strong>2011</strong>-<strong>12</strong> is Rs. 3300 crore. Status as on 31/3/<strong>2011</strong> is given below:<br />

(1) Installed Capacity (Own) (Including Common Pool) 4878 MW<br />

(2) Share from Central Sector Projects 1940 MW<br />

(3) Total Installed Capacity 6900 MW<br />

(4) Maximum Demand Met Within 2010-11 8007 MW<br />

(5) Energy Sent Out 46985.573 Mu<br />