UWS-4 Integrated Development of Urban Infrastructure in Bathinda city<br />

4<strong>12</strong><br />

Outlay - Rs. 200.00 lac<br />

11.6.<strong>12</strong> A Project for “Integrated Development of Urban Infrastructure in Bathinda<br />

city (<strong>Punjab</strong>)” was posed to the <strong>Planning</strong> Commission (GoI) at an estimated cost of Rs.<br />

11862.81 lac during 2004-05 for providing urban infrastructure facilities to the residents of<br />

the city. During the year 2005-06, Government of India had released Rs. 40.00 crore as one<br />

time ACA out of which Rs. 7.90 crore were released to MC, Bathinda and 32.10 crore to<br />

PWSSB.<br />

11.6.13 An outlay of Rs. 5097.90 lac has been provided in the 11 th Five Year Plan.<br />

An outlay of Rs. 100.00 lac was earmarked during 2008-09 against which an expenditure of<br />

Rs. 328.34 lac was incurred. An outlay of Rs. 1.00 lac was provided in the Annual Plan<br />

2009-10 against which an expenditure of Rs. 203.76 lac was incurred. Against an outlay of<br />

Rs. 200.00 lac provided in the Annual Plan 2010-<strong>2011</strong> an expenditure of Rs. 144.49 lac has<br />

been incurred. An outlay of Rs. 200.00 lac has been provided in the Annual Plan <strong>2011</strong>-<strong>12</strong> at<br />

current year level.<br />

UWS-7 Laying of main sewerage line to check contamination of water in the<br />

Phagwara Town<br />

Outlay - Rs. 200.00 lac<br />

11.6.14 To check contamination of water in the Phagwara Town, a main sewer line<br />

with an estimated cost of Rs. 8.21 crore from Hoshiarpur road to GT road which would go<br />

through Shivpuri and backside of JCT Mill Phagwara will be constructed. The total length of<br />

sewer would be 9 km. The work is being executed by PWSSB. An amount of Rs. 2.00 crore<br />

was released by FD during 2007-08 but no expenditure was incurred. An outlay of Rs.<br />

200.00 lac has been provided in the Annual Plan 2008-09 and an expenditure of Rs. 408.47<br />

lac was incurred. An outlay of Rs. 10.00 lac was provided in the Annual Plan 2009-10<br />

against which an expenditure of Rs. 93.26 lac was incurred. An outlay of Rs. 100.00 lac is<br />

provided in the Annual Plan 2010-<strong>2011</strong> against which expenditure of Rs. 5.38 lac has been<br />

incurred. An outlay of Rs. 200.00 lac has been provided in the Annual Plan <strong>2011</strong>-<strong>12</strong>.