15.12.2012 Views

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RT-3 Grant in aid to <strong>State</strong> Road Safety Council for Road Safety measures.<br />

Outlay - Rs. 240.00 lac<br />

8.1.5 Road Safety Council has been constituted by the state government. However,<br />

in almost all of the depots of the <strong>Punjab</strong> Roadways the recovery vans are in a bad condition.<br />

The cost of one recovery van approximately comes to be Rs. 24.18 lakhs. An amount of Rs.<br />

240.00 lac is provided in the Annual Plan <strong>2011</strong>-<strong>12</strong> for the purchase of 10 recovery vans.<br />

RT-4 Renovation of International Bus Terminal at Youth Hostel of Amritsar<br />

Outlay -Rs. 25.00 lac<br />

8.1.6 Youth hostel of Amritsar was converted into an international bus terminal and<br />

international bus service was started by <strong>Punjab</strong> Roadways from Amritsar to Lahore and<br />

Amritsar to Nankana Sahib. An outlay of Rs. 20.00 lacs is provided for the 11 th Five Year<br />

Plan (2007-<strong>12</strong>). This bus stands immediately needs the installation of flood lights and<br />

surveillance systems. An outlay of Rs. 25.00 lakhs is provided for this purpose in the Annual<br />

Plan <strong>2011</strong>-<strong>12</strong>.<br />

RT-5 Funds for Pepsu Road Transport Corporation (PRTC) <strong>State</strong> Govt.<br />

Equity Share Capital) - For replacement of Buses<br />

Outlay – Nil<br />

8.1.7 An outlay of Rs. 5000.00 lac is provided for the 11 th Five Year Plan (2007-<br />

<strong>12</strong>).<br />

RT-6 Workshop facilities<br />

8.1.8<br />

Outlay - Rs. 22.00 lac<br />

The purpose of the scheme is to upgrade the existing workshop facilities/<br />

purchase of new equipment. An amount of Rs. 22.00 lakhs is provided in the Annual Plan<br />

<strong>2011</strong>-<strong>12</strong> for the purchase of machinery.<br />

RT-7 Construction of Bus Stand of Chawinda Devi<br />

8.1.9<br />

Outlay – Nil<br />

Construction work of this bus stand has been taken-up through PIDB. The<br />

total project cost is Rs. 5.00 crore. This project started in 2009-10 has been completed. No<br />

outlay is provided in the Annual Plan <strong>2011</strong>-<strong>12</strong> against the expenditure of Rs. 193.26 lac<br />

during the year 2010-11.<br />

210

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!