8.2.2 In the 10 th Plan, the expenditure incurred was Rs. 1053.74 crore. During 2007-08, the<br />

expenditure incurred was Rs. 630.63 crore. The expenditure incurred during 2008-09 and<br />

2009-10 was Rs. 520.28 crore and Rs. 420.94 crore respectively. Against the expenditure of<br />

Rs. 5<strong>12</strong>55.20 lakhs during the year 2010-11, an outlay of Rs. 60701.00 lakhs is provided in<br />

the Annual Plan <strong>2011</strong>-<strong>12</strong> under this sub head.<br />

On going Schemes<br />

Centrally Sponsored Schemes<br />

RB-1 World Bank Scheme for Road Infrastructure<br />

2<strong>12</strong><br />

Outlay – Rs. 22500.00 lac<br />

8.2.3 A World Bank project for Rs. 1500 crore, with a loan assistance of (USD 333<br />

Million) was signed on 26/2/2007. The World Bank would contribute 75% while the<br />

remaining 25% will be contributed by the state government. The work for the upgradation of<br />

state plan roads of around 1100 km is to be covered under this project. The expenditure<br />

incurred so far on this project is Rs. 637.44 crore and the civil works on 700 km plan road<br />

length under phase–I are in progress. The periodic maintenance work on a length of 350 km<br />

with expenditure of Rs. 59 crore has been completed. The rehabilitation on length of 205 km<br />

was completed during 2009-10 with the project cost of Rs. 248.63 crores and upgradation on<br />

152 km road length with cost of Rs. 380 crore is in progress (work on road length of 40.50<br />

km has already been completed with the cost of Rs. 40.24 crores). The consultant has been<br />

finalized for the remaining 960 km road network to be under taken in phase-II. The work has<br />

not been started.<br />

8.2.4 In the 10 th Plan, the expenditure incurred was Rs. 3370.00 lac. During 2007-<br />

08, the expenditure incurred was Rs. 348.64 crore. The expenditure incurred during 2008-09<br />

and 2009-10 was Rs. 288.80 crore and Rs. 150.00 crore respectively. An outlay of Rs. 225.00<br />

crore is provided during the year <strong>2011</strong>-<strong>12</strong> against the expenditure of Rs. 94.06 crore during<br />

the year 2010-11.<br />

RB-2/RB-4 NABARD Assisted Projects<br />

Outlay – Rs. 25000.00 lac<br />

(i) NABARD assisted project for construction /widening of roads and<br />

construction of bridges and Building Infrastructure RIDF-(V-XII)<br />

(80:20)<br />

8.2.5 To strengthen the road infrastructure in the rural areas in the state through<br />

widening/four-laning and construction of bridges to meet traffic requirements of the 21 st<br />

Century, several projects have been sanctioned by NABARD. For this purpose, 80% will be