(6) Connected Load 27385.044 MW<br />

(7) Per Capita Consumption <strong>12</strong>36 kwh/yr<br />

(8) Numbers of Villages Provided Urban Pattern<br />

Supply including Deras and Dhanis<br />

18866* Nos.<br />

(9) T and D Losses(Including Commercial) 20.<strong>12</strong>%<br />

(10) No of grid Sub Stations 775<br />

(11) Length of Transmission Lines 16424 Ckt km<br />

(<strong>12</strong>) Length of 11 KV Lines 177419 Ckt km<br />

(13) Number of Distribution Transformers 472238<br />

(14) Length of LT Lines 164093 Ckt km<br />

(15) Number of Connections 7320631<br />

(i) General 6056471<br />

(ii) Industrial 117844<br />

(iii) Agriculture 1143267<br />

(iv) Others 3049<br />

*Including <strong>12</strong>428 villages and 695 deras and dhanis and 5743 additional deras/dhanies<br />

having a cluster of 5 or more houses.<br />

Ongoing Schemes<br />

Centrally Sponsored Schemes<br />

PP-1 Transmission System<br />

184<br />

Outlay – Rs. <strong>12</strong>7000.00 lac<br />

6.1.5 The outlay for transmission includes execution of various 220/132/66/33KV<br />

sub stations and transmission lines, renovation and modernization works of existing sub<br />

stations, various PLC works and evacuation systems for Talwandi Sabo Thermal Plant<br />

through PGCIL on Turn Key basis. During 11 th Five Year Plan an outlay of Rs. 2445.74<br />

crore has been allocated to this component which included distribution, Restructured<br />

Accelerated Power Development Programme & Rajiv Gandhi Gramin Viduti karan Yojana.<br />

An expenditure of Rs. 875.00 crore and Rs. 1056.33 crore was spent on this sector during<br />

2007-08 & 2008-09 respectively. The expenditure incurred during 2009-10 was Rs. 282.41<br />

crore. An expenditure of Rs. 73600.00 lac was incurred against the approved outlay of Rs.<br />

70000.00 lac during 2010-11. The outlay provided for Annual Plan <strong>2011</strong>-<strong>12</strong> is Rs.