FC-13 Link Drains/Water logging, Flood Control Drainage works in the <strong>State</strong>-<br />

RIDF-XIV (95:5)<br />

Outlay - Rs. 1500.00 lac<br />

5.1.59 In order to tackle the water logging problems in south-western districts of the<br />

<strong>State</strong>, NABARD has approved 27 schemes with a total cost of Rs. 25.73 crore (NABARD<br />

share Rs. 24.04 crore and state share Rs. 1.69 crore) on 17/11/2008 for construction of sub-<br />

surface drains and lift schemes. NABARD has also approved 9 schemes of Rs. 38.23 crore<br />

(NABARD share Rs. 37.05 crore and state share Rs. 1.18 crore) for tackling of water logging<br />

problem in district Muktsar. The target dated is 31/3/20<strong>12</strong>. Expenditure incurred during<br />

2009-10 was Rs. 611.18 lac. An expenditure of Rs. <strong>12</strong>9.90 lac was incurred against the<br />

approved outlay of Rs.1000.00 lac during 2010-11. An outlay of Rs.1500 lac is provided for<br />

Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

FC-10 Construction of New Drains and Flood Protection works and Anti Water<br />

logging programme in the <strong>State</strong> (ACA 2008-09)<br />

5.1.60 To tackle the problem of water logging, a team of experts from CGWB visited<br />

the water logged areas of Muktsar, Ferozepur and Faridkot Districts during the month of<br />

September-October, 2007. The team suggested various measures to reduce water logging.<br />

On the basis of recommendations made by CGWB team, a comprehensive Anti-Water<br />

Logging project has been prepared comprising of schemes concerning new surface drains,<br />

sub-surface drains, installation/rejuvenation of lift pumps and correction in deficiencies of<br />

existing drains by constructing new bridges or by deepening and widening of the drains. The<br />

estimated cost of this project is about Rs. 300.00 crore. It is long term project and will<br />

relieve about 72000 acres from the menace of water logging. The population to the extent of<br />

Rs. 4 lac will be benefited. One time ACA of Rs. 30 crore was provided for this project<br />

against which an expenditure of Rs. 2009.91 lac was incurred during 2009-10. No outlay is<br />

provided for this scheme in the Annual Plans 2010-11 & <strong>2011</strong>-<strong>12</strong>.<br />

FC-1 Project for Reclamation of Water Logged and Saline area of Jamuana<br />

and Ratta Khera blocks of Muktsar (60:40)(CSS)<br />

5.1.61 Two pilot schemes costing Rs. 940.00 lac for development of water logged<br />

areas in Ratta Khera and Jamuana Blocks in district Muktsar were sanctioned by the<br />

Department of Waste Land Development for Ministry of Rural Area and Employment,<br />

Government of India in 1998. The sharing pattern of the scheme is 60:40 between GoI and<br />

GoP. Accordingly an amount of Rs. 602.45 lac and Rs. 337.55 lac was to be contributed by<br />

the GoI and state government respectively. The objectives of project were to reclaim 1487<br />