embankments on both sides of the creek, construction of bridges over the creek and roads<br />

interconnecting the villages. Land measuring 9500 acres was reclaimed from the bed of<br />

Rahon creek. In the 10 th Plan, the expenditure incurred was Rs. 1432.96 lac. The project is<br />

completed. No outlay is provided for Annual Plan 2010-11 & <strong>2011</strong>-<strong>12</strong>.<br />

FC-6 Project for Construction of Flood Protection works on River Ghaggar<br />

and its Tributaries in Districts Patiala and Fatehgarh Sahib of <strong>Punjab</strong>-<br />

(RIDF-IX)(95:5) (Completed)<br />

5.1.65 The NABARD had approved this project with a cost of Rs. 3091.00 lac in<br />

2003. The NABARD assistance was Rs. 2936.00 lac and state share was Rs. 155.00 lac. This<br />

project envisaged construction of embankments in a length of 23 km, river training works i.e.<br />

32 studs and pitching in a length of 1.53 km, re-sectioning of drainage system in a length of<br />

<strong>12</strong>3 Km and construction of 9 bridges. In the 10 th Plan, the expenditure incurred was Rs.<br />

1813.07 lac. During 2007-08, the expenditure incurred was Rs. 41.09 lac. The expenditure<br />

incurred during 2008-09 was Rs. 167.30 lac. Outlay approved for Annual Plan 2009-10 was<br />

Rs. 90.00 lac. The project is completed. No outlay is provided for Annual Plans 2010-11 &<br />

<strong>2011</strong>-<strong>12</strong>.<br />

<strong>State</strong> Funded Scheme<br />

FC-8 Flood Control and Drainage scheme (W & S)<br />

178<br />

Outlay - Rs. 1000.00 lac<br />

5.1.66 There are three perennial rivers namely Ravi, Beas and Sutluj in the state and<br />

one non-perennial river Ghaggar, besides a large number of choes, Nadies and Khads also<br />

traverse the Sub-Mountainous and alluvial plains before out falling into parent river.<br />

Multipurpose storage reservoirs stand constructed on river Sutluj at Bhakhra, river Beas at<br />

Pong and Ranjit Sagar Dam on river Ravi which was completed in 2001. Due to<br />

construction of Dams on 3 rivers the menace of flash floods has been considerably reduced<br />

but flash floods are still experienced in river Ghaggar due to non-construction of dam on this<br />

river. The Drainage Administration is entrusted with the work of maintenance and repair of<br />

1800 km. long flood protection embankments (Dhusis), 3800 river training works and 8000<br />

km, long drainage system. In the 10 th Plan, the expenditure incurred was Rs. 2246.19 lac.<br />

During 2007-08 and 2008-09 the expenditure incurred was Rs. 550.00 lac and Rs. 578.50 lac.<br />

The expenditure incurred during 2009-10 was Rs. 920.31 lac. An expenditure of Rs. 720.63<br />

lac was incurred against the approved outlay of Rs. 1000.00 lac during 2010-11. Rs. 1000.00<br />

are provided for this scheme in the Annual Plan <strong>2011</strong>-<strong>12</strong>.