15.12.2012 Views

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

expenditure of Rs. 140.38 lac was incurred during 2010-11. An outlay of Rs. 4000.00 lac is<br />

provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

EDS-17 Creation of posts for 351 schools upgraded under NABARD project-<br />

state level salary scheme.<br />

337<br />

Outlay – Rs. 5273.00 lac<br />

11.1.43 This is a salary scheme inducted during 2010-11 with the aim of providing<br />

funds to 5287 posts which includes 2106 vocational masters/mistresses, 1902 lecturers, 500<br />

senior laboratory attendants, 351 librarians, 351 library restorers and 77 principals in those<br />

351 schools which have been upgraded under the NABARD project. An expenditure of<br />

Rs. 831.94 lac was incurred during 2010-11. An outlay of Rs. 5273.00 lac is provided for<br />

the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

EDS-18 Improvement of laboratory infrastructure by providing science materials<br />

in 351 schools upgraded under NABARD project (RIDF-XVI)<br />

Outlay – Rs. 864.20 lac<br />

11.1.44 This scheme has been inducted with the aim of providing laboratory<br />

infrastructure in 351 schools upgraded earlier under NABARD project. The project period is<br />

2010-20<strong>12</strong>. The total cost of the project is Rs. 1440.35 lac (NABARD share Rs. <strong>12</strong>24.30 lac<br />

+ state share Rs. 216.05 lac). An amount of Rs. 864.20 lac (NABARD share – Rs. 734.57<br />

lac + state share- Rs. <strong>12</strong>9.63 lac) is provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

Schemes having Nil outlays<br />

EDS-10 Infrastructural development of schools in the rural areas of the state with<br />

the assistance of RIDF-XIII NABARD (85:15)<br />

11.1.45 ABARD has sanctioned the project for upgrading infrastructure of 351 rural<br />

schools (67 high schools + 284 senior secondary schools) in the <strong>State</strong>. Out of 284 senior<br />

secondary schools, 65 are science stream schools. The total cost of the project is Rs. 141.45<br />

crore on the funding pattern 85:15 (NABARD: <strong>State</strong> Government).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!