and Gurdaspur with approximate cost of Rs. 118 crore (75% GoI Grant and 25% <strong>State</strong> share)<br />

has been sanctioned on 28/5/2008 by GoI. The following works are to be under taken;<br />

Date of start 11/<strong>12</strong>/2008<br />

Total Length to be Canalized 150 Kms<br />

Area to be Benefited 70000 Acres<br />

Population to be Benefited 500000 Nos<br />

Period of Completion 3 year(31-3-<strong>2011</strong>)<br />

Total Length of Drains out falling 328 Kms<br />

New Bridges to be Constructed 30 Nos<br />

5.1.57 Expenditure incurred during 2009-10 was Rs. 559.28 lac. An expenditure of<br />

Rs. 1565.25 lac was incurred against the approved outlay of Rs.1000.00 lac during 2010-11.<br />

Rs. 1500.00 lac are provided for this programme in the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

FC <strong>12</strong> Investment Clearance Plan for Flood Protection Works under Flood<br />

Management Programme (FMP) of GoI (75:25)<br />

175<br />

Outlay - Rs. 1500.00 lac<br />

5.1.58 <strong>Punjab</strong> being a riparian <strong>State</strong> has to suffer and face devastation due to floods<br />

in three rivers i.e. Ravi, Sutluj and Beas whereas non-riparian <strong>State</strong>s Rajasthan and Haryana<br />

remain immune to adverse action of floods. The <strong>State</strong> Government has submitted projects of<br />

Rs. 330.00 crore for flood protection works to Central Water Commission (CWC) for<br />

approval. The CWC, GoI has sanctioned following three projects with a cost of Rs. 30.99<br />

crore (75% GoI Grant and 25% state share) under Flood Management Programme:<br />

Name of the project Cost (Rs. crore)<br />

(i) Construction of FPW along I-R Bandh on river Sutluj 11.67<br />

and local protection works along choes in district<br />

Nawanshahar.<br />

(ii) Plugging and stg. breaches and bringing to design 11.27<br />

section of FPE along choes in district Hoshiarpur(Part-I)<br />

(iii) Plugging and strengthening breaches and bringing to<br />

8.05<br />

design section of FPE along Mechagerwal choe, Arniala<br />

choe and Gambowal choe in district Hoshiarpur(Part-I)<br />

Total: 30.99<br />

An expenditure of Rs. 469.00 lac was incurred against the approved outlay of Rs. 2000.00 lac<br />

during 2010-11. An outlay of Rs. 1500.00 lac is provided for this scheme in the Annual Plan<br />

<strong>2011</strong>-<strong>12</strong>.