the state government has approved projects of Rs. 48.30 crore to be implemented by Soil &<br />

Water Conservation, Irrigation & Local Govt. Department. No expenditure was been<br />

incurred under this scheme during 2009-10. A token provision of Rs. 1.00 lac was provided<br />

in the Annual Plan 2010-11. However in the Revised Estimate 2010-11, Rs. 4573.00 lac was<br />

provided against which an expenditure of Rs. 593.10 lac has been incurred. An outlay of Rs.<br />

500.00 lac is provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

UWS-19 Providing storm water sewer on National Highway at Tarn Taran (PIDB)<br />

417<br />

Outlay –Rs. 700.00 lac<br />

11.6.26 PIDB in its 95 th meeting held on 8.7.2010, a project costing of Rs. 14.27 crore<br />

has been approved. PIDB has deposited Rs. 800.00 lac in Govt. Treasury for release to<br />

PWSSB but these funds have not been released. Again PIDB has released Rs. 2.00 crore<br />

directly to PWSSB to start the work immediately. An expenditure of Rs. 332.23 lac has been<br />

incurred during 2010-11. However, an outlay of Rs. 700.00 lac is provided for the Annual<br />

Plan <strong>2011</strong>-<strong>12</strong>.<br />

UWS-20 Providing water supply, sewerage, sewage, treatment plant at Tarn Taran<br />

Outlay –Rs. 700.00 lac<br />

11.6.27 PIDB in its 95 th meeting held on 8.7.2010, a project costing of Rs. 31.86 crore<br />

has been approved. PIDB has deposited Rs. 300.00 lac in Govt. Treasury for release to<br />

PWSSB but these funds have not been released. Again PIDB has released Rs. 2.00 crore<br />

directly to PWSSB to start the work immediately. An expenditure of Rs. 410.02 lac has been<br />

incurred during 2010-11. However, an outlay of Rs. 700.00 lac has been provided in the<br />

Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

UWS-21 Extension & Augmentation of water supply scheme at Bhaloth district<br />

Kapurthala<br />

Outlay –Rs. 0.00 lac<br />

11.6.28 A project costing Rs. 181.19 lac has been approved by Technical Advisor to<br />

Hon’ble Chief Minister, <strong>Punjab</strong> vide letter No.87 dated 28.6.2010. Under this project 13.31<br />

Kms water supply line and one No. tubewell is to be installed. Total funds are to be provided<br />

by PIDB. An outlay of Rs. 181.19 lac was provided in the Revised Estimates of 2010-11