water supply has been provided in 1439 NC (not covered) village & service level of 2654 PC<br />

(partially covered) village have been augmented. An outlay of Rs. 7000.00 lac has been<br />

provided in the 11 th Five Year Plan. There is a target of covering 564 NC, 539 PC, 703 OH<br />

(NC) and 731 OH (PC) jointly under Accelerated Rural Water Supply Programme and Rajiv<br />

Gandhi National Drinking Water Mission during 11 th Five Year plan period An expenditure<br />

of Rs. 1346.79 lac as state share was incurred during 2007-08. An expenditure of Rs. 911.48<br />

lac as state share was incurred during 2008-09 and 473 quality affected habitation were<br />

covered. An outlay of Rs. 700.00 lac was provided in Annual Plan 2009-10 against which an<br />

expenditure of Rs. 861.11 lac was incurred. An outlay of Rs. 1000.00 lac is provided in the<br />

Annual Plan 2010-<strong>2011</strong> against which an expenditure of Rs. 723.28 lac has been incurred.<br />

However, an outlay of Rs. 700.00 lac has been provided in the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

RWS-2 NABARD Aided Rural Water Supply Schemes (85:15)<br />

421<br />

Outlay – Rs. 4000.00 lac<br />

11.6.36 An outlay of Rs. 55000.00 lac has been provided in the 11 th Five Year Plan.<br />

An expenditure of Rs. 9397.24 lac was incurred in 2007-08 and water supply in 1006 villages<br />

(NC154+PC852) was commissioned. An outlay of Rs. 7000.00 lac has been provided for<br />

Annual Plan 2008-09 against which an expenditure of Rs. 8870.46 lac was incurred and 260<br />

NC and 709 PC were commissioned. The details as on 31-<strong>12</strong>-10 are given as under –<br />

(Rs. Lac)<br />

Name of the Total Progress so far Balance<br />

project (Year) amount<br />

Financial Physical Financial Physical Remarks<br />

(Villages)<br />

(Villages)<br />

RIDF VI (2000-<br />

01)<br />

5973.10 5429.13 365 0.00 0 Completed<br />

RIDF VII (2001-<br />

02)<br />

10594.11 9700.85 632 0.00 0 -do-<br />

RIDF VIII (2002-<br />

03)<br />

14418.58 <strong>12</strong>958.66 954 0.00 0 -do-<br />

RIDF IX (2003-<br />

04)<br />

15891.38 14845.99 1131 0.00 0 -do-<br />

RIDF XI (2005- 26158.49 22097.15 996 4061.34 213 Target date<br />

06)<br />

March,11<br />

RIDF XII(2006-<br />

07)<br />

9724.00 7183.51 409 2540.72 165 -do-<br />

Total: 82759.89 72215.29 4487 6602.06 378<br />

11.6.37 An outlay of Rs. <strong>12</strong>000.00 lac was provided in Annual Plan 2009-10 to<br />

complete the ongoing projects. An expenditure of Rs. 6549.59 lac was incurred during 2009-