ha of waterlogged area falling in eight villages namely, Ratta Khera, Abulkhurana, Aliana,<br />

Shajrana, Jamuana, Jhabelwali, Takhat Malana, Halimwala. During 2007-08 the expenditure<br />

incurred was Rs. 17.84 lac. The outlay approved for Annual Plan 2009-10 was Rs. 10.00 lac.<br />

No outlay is provided for Annual Plans 2010-11and <strong>2011</strong>-<strong>12</strong>.<br />

FC-1(i) Project for Capital Expenditure to carry out Anti-Water Logging<br />

Operations in Muktsar District (ACA) (2007-08).<br />

5.1.62 The aim of the scheme is to tackle the ongoing problem of water logging in<br />

low lying areas of Muktsar District. Accordingly, an outlay as Rs. 3629.00 lac as one time<br />

ACA sanctioned by GoI during the previous years has been diverted from various schemes in<br />

the Annual Plan 2007-08 to carry out the Anti-Water Logging Operations in Muktsar district.<br />

During 2007-08, the expenditure incurred was Rs. 2800.00 lac. The work is in progress. The<br />

expenditure incurred during 2008-09 was Rs. 344.00 lac. No outlay is provided for Annual<br />

Plans 2010-11 & <strong>2011</strong>-<strong>12</strong>.<br />

FC-3 Project for flood protection works on rivers Ravi, Beas and Sutlej and<br />

providing protection to drainage system to save Agriculture land and<br />

villages abadies in districts Gurdaspur and Amritsar-(RIDF X)(95:5)<br />

(Completed)<br />

5.1.63 NABARD assisted project namely project proposal for flood protection works<br />

on rivers Ravi, Beas and Sutlej and providing protection to drainage system to save<br />

agriculture land and villages abadies in districts Gurdaspur and Amritsar with a cost of Rs.<br />

2960.00 lac (NABARD share Rs. 2769.00 lac state share Rs. 191.00 lac) was started. During<br />

2007-08 and 2008-09 the expenditure incurred was Rs. 240.00 lac and Rs. 34.<strong>12</strong> lac<br />

respectively. The project is almost completed, no outlay is provided for Annual Plans 2009-<br />

10, 2010-11 & <strong>2011</strong>-<strong>12</strong>.<br />

FC-4 Project for Constructing flood protection works along river Sutluj and<br />

Canalization of Rahon Creek out falling into river Sutluj alongwith<br />

construction of bridges on Banga Gopalpur Drain and East Bein in<br />

districts Jalandhar and Nawanshahar-(RIDF-VII) (95:5) (Completed)<br />

5.1.64 A project namely "Constructing Flood Protection works along river Sutluj and<br />

canalisation of Rahon creek out falling into river Sutluj alongwith construction of bridges on<br />

Banga Gopalpur drain and east Bein in district Jalandhar and Nawanshahar" was approved by<br />

NABARD at a cost of Rs. 1932.00 lac. NABARD share was Rs. 1739.00 lac and state share<br />

was Rs. 193.00 lac. The project proposal for the canalizing included construction of<br />

177