works at Patti. An amount of Rs. 891.00 lac was provided in the Annual Plan 2009-10<br />

against which an expenditure of Rs. 4.78 lac was incurred. However, an amount of Rs.<br />

400.00 lac is provided in the Annual Plan 2010-<strong>2011</strong> against which an expenditure of Rs.<br />

151.19 lac has been incurred. An outlay of Rs. 500.00 lac is provided for the Annual Plan<br />

<strong>2011</strong>-<strong>12</strong>.<br />

(v) UWS-<strong>12</strong> Water Supply and Sanitation & Sewerage Scheme at Gidderbaha<br />

415<br />

Outlay– Rs. 700.00 lac<br />

11.6.20 The total estimated cost of this project is Rs 20.41 crore and work was started<br />

during 2007 and completion year 2009. During 2009-10 PIDB has released Rs. 541.00 lac for<br />

taking up water supply and sanitation & sewerage works at Gidderbaha. An amount of Rs.<br />

541.00 lac was provided in the Annual Plan 2009-10 against which an expenditure of<br />

Rs.1148.39 lac was incurred. Now estimate amounting to Rs. 3273.00 lac has been sent to<br />

PIDB, out of which Rs. 2462.09 lac has been released up till now. However, an outlay of Rs.<br />

<strong>12</strong>30.00 lac is provided in the Annual Plan 2010-<strong>2011</strong> against which expenditure of Rs.<br />

242.00 lac has been incurred. An outlay of Rs. 700.00 lac is provided for the Annual Plan<br />

<strong>2011</strong>-<strong>12</strong>.<br />

(vi) UWS-14 Provision for Water Supply & Sewerage and STP at Ropar and Nangal<br />

Outlay –Rs. 500 .00 lac<br />

11.6.21 The Chief Minister, <strong>Punjab</strong> has expressed his great concern regarding rising<br />

pollution to the rivers and other water bodies of the state. Initially, a sum of Rs. 5.00 crore<br />

was to be provided by PIDB during 2009-10 to PWSSB. Accordingly, DPR for Rs. 55.68<br />

crore for Ropar Town and DPR for Rs. 17.02 crore for Nangal Town were prepared and sent<br />

to PIDB. The scheme had been approved by PIDB in its 89 th meeting which was held on<br />

3.8.09 and an expenditure of Rs. <strong>12</strong>6.42 lac was incurred during 2009-10. For this purpose,<br />

an outlay of Rs. 1000.00 lac is provided in the Annual Plan 2010-<strong>2011</strong> against which an<br />

expenditure of Rs. 1411.70 lac has been incurred. An outlay of Rs. 500.00 lac is provided for<br />

the Annual Plan <strong>2011</strong>-<strong>12</strong>.