19.07.2014 Views

OneSight Administrator Guide

OneSight Administrator Guide

OneSight Administrator Guide

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Adding a Smartlink to a Monitor Group<br />

3. Specify the number of monitors below the dependency node<br />

that must be in Warning or Critical State before the dependency<br />

node triggers the specified action plan alert(s).<br />

4. Click OK to close the Dependency Node Editor.<br />

5. The new dependency node is added at the same level selected in<br />

step one.<br />

6. Use the arrow buttons to move dependency nodes and monitors<br />

to create the tree hierarchy.<br />

Adding a Smartlink to a Monitor Group<br />

The SmartLink tab lets you specify a URL to associate with the<br />

monitor group. The URL is available on the Status Details Page.<br />

URL – Enter the URL that you want to associate with this monitor or<br />

metric. The URL can include specific substitution variables.<br />

Rollover Text – Enter the text that you want to display when the<br />

mouse is rolled over the link on the Status Details page.<br />

Open in New Browser Window – Select this option to open a new<br />

browser window when the link is clicked in the Status Details page.<br />

104 <strong>OneSight</strong> <strong>Administrator</strong> <strong>Guide</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!