28.02.2013 Views

College Catalog Cover Design 2 - Pima Community College

College Catalog Cover Design 2 - Pima Community College

College Catalog Cover Design 2 - Pima Community College

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

BCT 190 Fieldwork for Construction<br />

1-8 cr. hrs. 5-40 periods (5-40 lab)<br />

Supervised fieldwork experience on a specific construction project at the project site.<br />

Recommendation: Completion of BCT 111, 112, 113, 114, and 115 before enrolling in this course.<br />

Information:<br />

May be taken two times for a maximum of sixteen credit hours.<br />

BCT course work or field experience will be necessary for success in this course. See a BCT instructor or department chair<br />

for more information.<br />

Offered: Fall, Spring, Summer.<br />

BCT 199 Introduction to Co-op: Building and Construction Technologies<br />

1 cr. hrs. 1 periods (1 lec.)<br />

See Cooperative Education section for description.<br />

Corequisite(s): BCT 199WK<br />

Information: May be taken two times for a maximum of two credit hours.<br />

Offered: Fall, Spring, Summer.<br />

BCT 199WK Co-op Work: Building and Construction Technologies<br />

1-8 cr. hrs. 5-40 periods (5-40 lab)<br />

See Cooperative Education section for description.<br />

Corequisite(s): BCT 199<br />

Information: May be taken two times for a maximum of sixteen credit hours.<br />

Offered: Fall, Spring, Summer.<br />

BCT 202 Construction Business Management<br />

3 cr. hrs. 3 periods (3 lec.)<br />

Overview of construction business and project management. Includes planning and organizing, risk management, project<br />

management, estimating, scheduling, environmental and safety laws, employer obligations, financial management,<br />

contract law, and Arizona state requirements for contractors.<br />

Offered: Fall, Spring.<br />

BCT 204 Construction Surveying<br />

3 cr. hrs. 5 periods (2 lec., 3 lab)<br />

Principles and techniques of construction surveying. Includes taping, leveling, transit, contour and topographic mapping,<br />

and construction surveying.<br />

Prerequisite(s): GTM 105 or MAT 086 or required score on the Mathematics assessment test.<br />

Recommendation: Completion of BCT 120 before enrolling in this course.<br />

Offered: Fall, Spring.<br />

BCT 231 Residential and Industrial HVAC IV<br />

4 cr. hrs. 6 periods (2 lec., 4 lab)<br />

Continuation of BCT 134. Includes refrigerants and oil, compressors, metering devices, retail refrigeration systems,<br />

commercial hydronic systems, and steam systems.<br />

Prerequisite(s): BCT 134.<br />

Offered: Fall, Spring, Summer.<br />

BCT 232 Residential and Industrial HVAC V<br />

4 cr. hrs. 6 periods (2 lec., 4 lab)<br />

Continuation of BCT 231. Includes planned maintenance, water treatment, troubleshooting electronic controls,<br />

troubleshooting oil heating, troubleshooting heat pumps, and troubleshooting accessories.<br />

Prerequisite(s): BCT 231.<br />

Offered: Fall, Spring, Summer.<br />

BUILDING/CONSTRUCTION TECHNOLOGY<br />

BCT 233 Residential and Industrial HVAC VI<br />

4 cr. hrs. 6 periods (2 lec., 4 lab)<br />

Continuation of BCT 232. Includes construction drawings and specifications, indoor air quality, energy conservation<br />

equipment, and building management systems.<br />

Prerequisite(s): BCT 232.<br />

Offered: Fall, Spring, Summer.<br />

BCT 234 Residential and Industrial HVAC VII<br />

4 cr. hrs. 6 periods (2 lec., 4 lab)<br />

Continuation of BCT 233. Includes water treatment, system startup and shutdown, heating and cooling system design,<br />

and commercial and industrial refrigeration systems.<br />

Prerequisite(s): BCT 233.<br />

Offered: Fall, Spring, Summer.<br />

<strong>Pima</strong> <strong>Community</strong> <strong>College</strong> <strong>Catalog</strong> 2011/2012 338

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!