PART 1- GENERAL<br />

1.1 SUMMARY<br />

SECTION 05 5000<br />

METAL FABRICATIONS<br />

A. Section Includes:<br />

1. Rough Hardware<br />

2. Loose Bearing and Leveling Plates<br />

3. Loose Steel Lintels<br />

4. Metal Ladders<br />

5. Support Angles for Elevator Door Sills<br />

6. Elevator Sump Pit Cover<br />

7. Pipe Bollards<br />

8. Miscellaneous Metal Trim<br />

9. Steel Framing and Supports for Applications where framing and<br />

supports are not specified in other Sections<br />

1.2 SUBMITTALS<br />

A. Shop Drawings detailing fabrication and erection of each metal fabrication<br />

indicated. Include plans, elevations, sections, and details of metal fabrications<br />

and their connections. Show anchorage and accessory items. Provide templates<br />

for anchors and bolts specified for installation under other sections.<br />

1.3 QUALITY ASSURANCE<br />

A. Fabricator Qualifications: Firm experienced in successfully producing metal<br />

fabrications similar to that indicated for this Project, with sufficient production<br />

capacity to produce required units without causing delay in the Work.<br />

B. Installer Qualifications: Arrange for installation of metal fabrications specified in<br />

this Section by same firm that fabricated them.<br />

C. Quality welding processes and welding operators in accordance with the<br />

following:<br />

1. AWS D1.1 "Structural Welding Code - Steel"<br />

2. D1.3 "Structural Welding Code - Sheet Steel"<br />

3. D1.2 "Structural Welding Code - Aluminum"<br />

D. Certify that each welder has satisfactorily passed AWS qualification tests for<br />

welding processes involved and, if pertinent, has undergone recertification.<br />

1.4 PROJECT/SITE CONDITIONS<br />

A. Field Measurements: Check actual locations of walls and other construction to<br />

which metal fabrications must fit, by accurate field measurements before<br />

fabrication; show recorded measurements on final shop drawings. Coordinate<br />

fabrication schedule with construction progress to avoid delay of Work.<br />

Project No.: 10145 METAL FABRICATIONS<br />

550 15th Street Dual Brand Hotel 055000 - 1<br />

19 March 2012