25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

D. Welder Certificates signed by Contractor certifying that welders comply with requirements<br />

specified under "Quality Assurance" article.<br />

E. Record Drawings: At project closeout, submit record drawings of installed systems<br />

products; in accordance with requirements of Divisions 1 and 23.<br />

F. Maintenance data for oil transfer equipment, for inclusion in Operating and Maintenance<br />

Manual specified in Divisions 1 and 23.<br />

1.04 QUALITY ASSURANCE:<br />

A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of fuel oil systems<br />

products of types, materials, and sizes required, whose products have been in satisfactory<br />

use in similar service for not less than 5 years.<br />

B. Installer Qualifications: Firm with at least 3 years of successful installation experience on<br />

projects with fuel oil systems work similar to that required for project.<br />

C. Qualify welding processes and welding operators in accordance with ASME "Boiler and<br />

Pressure Vessel Code, 11 Section IX, “Welding and Brazing Qualifications."<br />

D. Regulatory Requirements: Comply with provisions of the following codes:<br />

1. NFPA 31 - Standard for the Installation of Oil Burning Equipment, for oil piping<br />

materials and components, oil piping installations, and inspection and testing of<br />

fuel oil piping systems.<br />

2. NFPA 37 - Standard for the Installation and Use of Stationary Combustion Engines<br />

and Gas Turbines.<br />

3. Uniform Mechanical Code and Denver Building Department Code.<br />

4. BOCA Basic National Mechanical Code.<br />

5. Local fire department authority.<br />

6. EPA guidelines and regulations.<br />

E. UL Compliance: Provide fuel oil piping components which are listed and labeled by UL.<br />

1. UL 343 - "Standard for Pumps for Oil-Burning Appliances,” for oil transfer pumps.<br />

2. UL 567 - "Pipe Connections for Flammable and Combustible Liquids and LP-Gas,”<br />

for pipe connectors for fuel oil piping systems.<br />

3. UL File MH 1316 - "Standard for Glass-Fiber Reinforced Plastic Underground<br />

Storage Tanks for Petroleum Products," for oil storage tanks.<br />

4. American Petroleum Institute Std. 650, Welded Steel Tanks for Oil Storage<br />

(ANSI/API Std 650-78).<br />

1.05 SEQUENCING AND SCHEDULING:<br />

A. Coordinate the size and location of concrete ballast pads and fill at sounding boxes for<br />

housekeeping equipment pads for oil transfer pumps. Cast anchor bolt inserts into pad.<br />

Concrete reinforcement and formwork requirements are specified in Division 3.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 1113 - 2 FACILITY FUEL-OIL PIPING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!