25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

J. Prime-Coat Finish: Manufacturer's standard prime-coat finish ready for field painting.<br />

K. Galvanized Finish: After fabrication, hot-dip galvanize complying with ASTM A 123/A 123M.<br />

L. Factory-Painted Finish: Comply with NAAMM's "Metal Finishes Manual for Architectural and<br />

Metal Products" for recommendations for applying and designating finishes.<br />

1. Surface Preparation: Clean surfaces to comply with SSPC-SP 1, "Solvent Cleaning," to<br />

remove dirt, oil, grease, and other contaminants that could impair paint bond. Grind<br />

welds and polish surfaces to a smooth, even finish. Remove mill scale and rust, if present,<br />

from uncoated steel, complying with SSPC-SP 5/NACE No. 1, "White Metal Blast<br />

Cleaning," or with SSPC-SP 8, "Pickling."<br />

2. Interior Surfaces of Pole: One coat of bituminous paint, or otherwise treat for equal<br />

corrosion protection.<br />

3. Exterior Surfaces: Manufacturer's standard finish consisting of one or more coats of primer<br />

and two finish coats of high-gloss, high-build polyurethane enamel.<br />

2.9 ALUMINUM POLES<br />

a. Color: As selected by Architect or Interior Designer from manufacturer's full range.<br />

A. Poles: Seamless, extruded structural tube complying with ASTM B 429/B 429M, Alloy 6063-T6<br />

with access handhole in pole wall.<br />

B. Poles: ASTM B 209, 5052-H34 marine sheet alloy with access handhole in pole wall.<br />

1. Shape: as noted on drawings.<br />

2. Mounting Provisions: Butt flange for bolted mounting on foundation or breakaway<br />

support.<br />

C. Pole-Top Tenons: Fabricated to support luminaire or luminaires and brackets indicated, and<br />

securely fastened to pole top.<br />

D. Grounding and Bonding Lugs: Welded 1/2-inch threaded lug, complying with requirements in<br />

Section 26 0526 "Grounding and Bonding for Electrical Systems," listed for attaching grounding<br />

and bonding conductors of type and size listed in that Section, and accessible through handhole.<br />

E. Brackets for Luminaires: Detachable, with pole and adapter fittings of cast aluminum. Adapter<br />

fitting welded to pole and bracket, then bolted together with stainless-steel bolts.<br />

1. Tapered oval cross section, with straight tubular end section to accommodate luminaire.<br />

2. Finish: Same as pole.<br />

F. Prime-Coat Finish: Manufacturer's standard prime-coat finish ready for field painting.<br />

G. Aluminum Finish: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal<br />

Products" for recommendations for applying and designating finishes.<br />

1. Finish designations prefixed by AA comply with the system established by the Aluminum<br />

Association for designating aluminum finishes.<br />

2. Natural Satin Finish: Provide fine, directional, medium satin polish (AA-M32); buff<br />

complying with AA-M20; and seal aluminum surfaces with clear, hard-coat wax.<br />

Project No.: 10145<br />

550 15th Street Dual Brand Hotel<br />

03/19/2012<br />

265600 - 9 EXTERIOR LIGHTING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!