F. Gas Safety Valves: Gas safety valve latched open when energized, free handle design,<br />

manual reset, and a visual position indicator.<br />

PART 3 – EXECUTION<br />

3.01 INSPECTION:<br />

A. General: Examine areas and conditions under which natural gas systems materials and<br />

products are to be installed. Do not proceed with work until unsatisfactory conditions have<br />

been corrected in a manner acceptable to the Installer.<br />

3.02 PREPARATION:<br />

A. Precautions: Before turning off the gas to the premises or section of piping, turn off all<br />

equipment valves. Perform a leakage test as specified in "FIELD QUALITY CONTROL"<br />

below, to determine that all equipment is turned off in the piping section to be affected.<br />

B. Conform with the requirements in NFPA 54 for the prevention of accidental ignition.<br />

3.03 INSTALLATION OF PIPE:<br />

A. Install natural gas piping in accordance with Division 23, Section 232113.<br />

B. Conform to the requirements of NFPA 54, National Fuel Gas Code.<br />

C. Locations and Arrangements: Drawings (plans, schematics, and diagrams) indicate the<br />

general location and arrangement of piping systems. Design locations and arrangements<br />

of piping take into consideration pipe sizing, flow direction, slope of pipe, expansion, and<br />

other design considerations. So far as practical, install piping as indicated.<br />

D. Concealed Locations: Except as specified below, install concealed gas piping in an airtight<br />

conduit constructed of Schedule 40, seamless black steel with welded joints. Vent<br />

conduit to the outside and terminate with a screened vent cap.<br />

1. Above-Ceiling Locations: Gas piping may be installed in accessible above-ceiling<br />

spaces (subject to the approval of the authority having jurisdiction), whether or not<br />

such spaces are used as a plenum. Valves shall not be located in such spaces.<br />

2. In Floors: Piping installed in floors shall have protective wrapping specified in Part<br />

2 above. Piping cast in concrete slabs shall be surrounded with a minimum of 1-<br />

1/2 inches of concrete and shall not be in physical contact with other metallic<br />

structures such as reinforcing rods or electrically neutral conductors. Piping shall<br />

not be embedded in concrete slabs containing quick-set additives or cinder<br />

aggregate.<br />

3. Piping In Partitions: Concealed piping shall not be located in solid partitions.<br />

Tubing shall not be run inside hollow walls or partitions unless protected against<br />

physical damage. This does not apply to tubing passing through walls or<br />

partitions.<br />

4. Prohibited Locations: Do not install gas piping in or through a circulating air duct,<br />

clothes chute, chimney or gas vent, ventilating duct or dumb waiter or elevator<br />

shaft. This does not apply to accessible above-ceiling space specified above.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 1123 - 5 FACILITY NATURAL-GAS PIPING