25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

in an approved manner by the Contractor at his expense. Vibration control shall be<br />

accomplished by means of approved vibration eliminators installed in a manner<br />

recommended by the manufacturer of the eliminators.<br />

1.23 MECHANICAL COORDINATION DRAWINGS:<br />

A. Prepare and submit a set of coordination drawings as necessary or as required by the<br />

Engineer, showing major elements, components, and systems of mechanical equipment<br />

and materials in relationship with other building components. Prepare drawings to an<br />

accurate scale of 1/4” =1’-0” or larger. Indicate the locations of all equipment and<br />

materials, including clearances for installing and maintaining insulation, servicing and<br />

maintaining equipment, valve stem movement, and similar requirements. Indicate<br />

movement and positioning of large equipment into the building during construction.<br />

B. Prepare floor plans, reflected ceiling plans, elevations, sections, and details to conclusively<br />

coordinate and integrate all installations. Indicate locations where space is limited and<br />

where sequencing and coordination of installations are of importance to the efficient flow<br />

of the work, including (but not necessarily limited to) the following:<br />

1.24 PRODUCT LISTING:<br />

1. Mechanical equipment room layouts.<br />

2. Specific equipment installations, including:<br />

a. Chillers<br />

b. Cooling towers<br />

c. Boilers<br />

d. Pumps and compressors<br />

e. Tanks and heat exchangers<br />

f. Furnaces<br />

g. Air-handling units<br />

3. Work in pipe spaces, chases, trenches, and tunnels.<br />

4. Exterior wall penetrations.<br />

5. Ceiling plenums which contain piping, ductwork, or equipment in congested<br />

arrangement.<br />

6. Installations in mechanical riser shafts, at typical sections and crucial offsets and<br />

junctures.<br />

7. Pipe expansion loops.<br />

8. Numbered valve location diagrams.<br />

9. Exterior underground lines in common excavation.<br />

10. Manifold piping for multiple equipment units.<br />

A. Prepare listing of major mechanical equipment and materials for the project within (2) two<br />

weeks of signing the Contract Documents, and transmit to the Mechanical Engineer. A<br />

sample schedule is included at the end of this section to aid in completing this<br />

requirement.<br />

B. Unless otherwise specified, all materials and equipment shall be of domestic (USA)<br />

manufacture and shall be of the best quality used for the purpose in commercial<br />

application.<br />

C. Provide all information <strong>request</strong>ed.<br />

23 0010 - 11 BASIC MECHANICAL REQUIREMENTS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!