25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.3 ADJUSTING, CLEANING, AND PROTECTION<br />

A. Clean, lubricate, and adjust hardware. Adjust doors and latches to operate easily<br />

without binding.<br />

B. Protect metal lockers from damage, abuse, dust, dirt, stain, or paint. Do not permit<br />

metal locker use during construction.<br />

C. Touch up marred finishes, or replace metal lockers that cannot be restored to factoryfinished<br />

appearance. Use only materials and procedures recommended or furnished<br />

by metal locker manufacturer.<br />

END OF SECTION 10 5113<br />

Project No.: 10145 METAL LOCKERS<br />

550 15th Street Dual Brand Hotel 105113 - 6<br />

19 March 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!