3. Waste, Drain and Vent Piping: All waste and vent piping, including building<br />

drain, roof drain and building sewer, shall be subjected to a water test. All<br />

openings in the piping system shall be tightly closed, except the highest opening,<br />

and the system filled with water to the point of overflow. The water shall be kept<br />

in the system, or in the portion under test, for at least 15 minutes before inspection<br />

starts; the system shall then be tight to all points. No section shall be tested with<br />

less than a ten foot head of water. Roof drain piping shall be closed at the lowest<br />

point and filled with water to the point of overflow.<br />

4. Sump Pump Discharge: With water in sump and pump running at full capacity,<br />

check for leaks until satisfied that system is tight.<br />

5. Repair piping systems sections which fail required piping test, by disassembly and<br />

re-installation, using new materials to extent required to eliminate leakage. Do<br />

not use chemicals, stop-leak compounds, mastics, or other temporary repair<br />

methods.<br />

6. Drain test water from piping systems after testing and repair work has been<br />

completed.<br />

3.07 UNDERGROUND PIPE INSTALLATION:<br />

A. Clean fittings, nipples and other field joints thoroughly before coating.<br />

B. Protect ductile cast iron pipe installed below grade with polyethylene encasement applied<br />

in strict accordance with ANSI/AWWA C-105/A21.5.<br />

C. Install ductile iron pipe below grade as prescribed by AWWA C-600.<br />

D. Provide concrete thrust block and 3/4” threaded steel tie bar at each change of direction<br />

on underground pressure pipe. Imbed tie bar in thrust block and connect to upstream<br />

fitting. Paint tie bar with two coats of bitumastic #50 paint.<br />

E. Bury all outside domestic water, waste, and storm piping minimum 5’-0” below grade<br />

(earth cover below finish grade) to top of pipe.<br />

3.08 FIELD QUALITY CONTROL:<br />

A. Preparation for testing: Prepare hydronic piping in accordance with ASME B-31.9 and as<br />

follows:<br />

1. Leave joints, including welds, uninsulated and exposed for examination during the<br />

test.<br />

2. Provide temporary restraints for expansion joints which cannot sustain the<br />

reactions due to test pressure. If temporary restraints are not practical, isolate<br />

expansion joints from testing.<br />

3. Flush system with clean water. Clean strainers.<br />

4. Isolate equipment that is not to be subjected to the test pressure from the piping.<br />

If a valve is used to isolate the equipment, its closure shall be capable of sealing<br />

against the test pressure without damage to the valve.<br />

5. Install relief valve set at a pressure not more than 1/3 higher than the test<br />

pressure, to protect against damage by expansion of liquid or other source of<br />

overpressurization during the test.<br />

B. Testing: Test hydronic piping as follows:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

12/23/2011<br />

22 1116 - 16 BASIC PLUMBING PIPING