25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1.12 WARRANTY<br />

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or<br />

replace components of dehumidification units that fail in materials or workmanship within<br />

specified warranty period.<br />

1. Warranty Period for Compressors: Manufacturer's standard, but not less than five years<br />

from date of Substantial Completion.<br />

2. Warranty Period for Refrigerant Coils: Manufacturer's standard, but not less than five<br />

years from date of Substantial Completion.<br />

PART 2 - PRODUCTS<br />

2.1 MANUFACTURERS<br />

A. Basis-of-Design Product: Subject to compliance with requirements, provide product indicated on<br />

Drawings or comparable product by one of the following:<br />

1. PoolPak<br />

2. Four Seasons<br />

3. Munters/Des Champs<br />

2.2 PRINCIPLE OF OPERATION<br />

A. The unit shall control space temperature and relative humidity and pool water temperature.<br />

Warm moist air from the natatorium is drawn over an evaporator, and the latent and sensible<br />

heat is removed from the air. The heat captured by this process and the heat generated from the<br />

compressor power consumption are absorbed by a mechanical refrigeration system. The<br />

resulting dryer, cooler air is drawn over a reheat condenser coil and auxiliary heating coil (if<br />

provided) by a supply fan.<br />

B. The refrigeration system is activated if any of the following occur:<br />

1. Relative humidity rises above set point.<br />

2. Space temperature rises above the set point.<br />

C. The unit shall monitor space temperature and relative humidity, pool water temperature and<br />

building surface temperature.<br />

1. The thermal energy absorbed by the refrigeration system is distributed as follows:<br />

2.3 CONSTRUCTION<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

a. To maintain the natatorium space temperature.<br />

b. To maintain pool water temperature.<br />

c. Rejected to Water Cooled Condenser<br />

A. The cabinet shall be fabricated out of a minimum of 20 gauge G90 galvanized steel. The unit<br />

shall be painted with an electrostatically applied polyamide epoxy powder coating, with a<br />

thickness of 2-3 mils, baked and bonded at 420°F until it forms a hard, textured surface.<br />

23 8416 - 3 MECHANICAL DEHUMIDIFICATION<br />

UNITS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!