B. After alignment is correct, tighten the foundation bolts evenly but not too firmly. Fill the<br />

baseplate completely with non-shrink, non-metallic grout, with metal blocks and shims or<br />

wedges in place. After grout has cured, fully tighten foundation bolts.<br />

3.05 FIELD QUALITY CONTROL:<br />

A. Check suction line connections for tightness to avoid drawing air into the pump.<br />

3.06 START-UP:<br />

A. Final checks before start-up: Perform the following preventative maintenance operations<br />

and checks before start-up:<br />

1. Lubricate oil- and/or grease-lubricated bearings.<br />

2. Check that pump is free to rotate by hand. For pumps handling hot liquids, pump<br />

shall be free to rotate with the pump hot and cold. If the pump is bound or even<br />

drags slightly, do not operate the pump until the cause of the trouble is<br />

determined and corrected.<br />

3. Check motor for proper rotation. Rotation shall match direction of rotation<br />

marked on pump casing.<br />

B. If the pump is to be started against a closed check valve with the discharge gate valve<br />

open, the steps are the same, except that he discharge gate valve is opened some time<br />

before the motor is started.<br />

3.07 CLEANING:<br />

A. Cleaning: Clean factory-finished surfaces. Repair any marred or scratched surfaces with<br />

manufacturer’s touch-up paint.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 23 2123<br />

23 2123 - 6 HYDRONIC PUMPS