C. Leak Sensors: Each leak sensor shall contain a 316 stainless steel capacitance element<br />

bonded to a combination PVC/Epoxy Housing, and a PVC jacketed cable for electrical<br />

connections. The sensor shall pass through a minimum 2 inch NPT monitor fitting on each<br />

tank. The sensor shall be able to differentiate between liquid water and liquid hydrocarbon<br />

to a minimum depth of 0.1 inch and operate from -40° to 130°F and up to 50<br />

PSIG. Wiring to the console shall be standard 3 conductor (shielded not required) ,<br />

provided by others and terminated at the tank monitor fitting using watertight 1/2 inch<br />

NPT fittings.<br />

D. Leak detection shall be as follows:<br />

1. Control Unit(s) shall be Pneumercator model number LDE90OX. X = number of<br />

sensing points.<br />

2. Leak sensors shall be Pneumercator model 9-901 for fiberglass tank annular<br />

spaces, or model 9-902 for steel tank monitor pipes and piping sump areas.<br />

2.14 OVERFILL ALARM SYSTEM:<br />

A. Provide a complete operational working audible and visual alarm system for overfill<br />

condition.<br />

B. The system shell include the following construction features and performance.<br />

PART 3 – EXECUTION<br />

3.01 INSPECTION:<br />

1. NEMA 4 painted steel enclosure<br />

2. Suitable operating temperature range of -40°F to 150°F<br />

3. 120v/1Phase<br />

4. Audible alarm 78dB to 103 dB at 10 feet distance, with adjustable duration time<br />

on from 0 to 60 seconds.<br />

5. Visual alarm using a 25 watt 120 VAC lamp with red polycarbonate lens and a<br />

flashing rate of 75 per minute.<br />

6. Alarm acknowledgment switch with actuating lamp.<br />

7. Programmable overfill alarm limit set for each tank.<br />

8. Auxiliary contacts compatible with building automation system for remote<br />

monitoring.<br />

A. General: Examine areas and conditions under which fuel oil systems materials and<br />

products are to be installed. Do not proceed with work until unsatisfactory conditions have<br />

been corrected in manner acceptable to Installer.<br />

3.02 INSTALLATION OF BASIC IDENTIFICATION:<br />

A. General: Install mechanical identification in accordance with Division 23 Basic<br />

Mechanical Materials and Methods section “Mechanical Identification.”<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 1113 - 8 FACILITY FUEL-OIL PIPING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!