25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of piping and with OD<br />

that completely covers opening.<br />

C. Furnish pipe Escutcheons with nickel or chrome finish for occupied areas, prime paint finish for<br />

unoccupied areas.<br />

D. Escutcheons for Moist Areas: Provide cast brass or sheet brass, solid or split hinged.<br />

E. Install floor plates for piping penetrations of equipment-room floors.<br />

F. Install floor plates with ID to closely fit around pipe, tube, and insulation of piping and with OD<br />

that completely covers opening.<br />

1. New Piping: One-piece, floor-plate type.<br />

2. Existing Piping: Split-casting, floor-plate type.<br />

3.2 FIELD QUALITY CONTROL<br />

A. Replace broken and damaged escutcheons and floor plates using new materials.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 22 0518<br />

22 0518 - 2 ESCUTCHEONS FOR PLUMBING<br />

PIPING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!