25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. National Electrical Manufacturers Association (NEMA)<br />

6. Underwriters Laboratories (UL)<br />

7. Electrical Testing Laboratories (ETL)<br />

8. National Electrical Code (NEC)<br />

G. Certification of Pump Performance: Provide pumps whose performance, under specified<br />

operating conditions, is certified by manufacturer.<br />

1.03 SUBMITTALS:<br />

A. Product Data: Submit manufacturer's pump specifications, installation and start-up<br />

instructions, and current accurate pump characteristic performance curves, including pump<br />

curve and system curves, with selection points clearly indicated. Motors shall be selected<br />

for operation at site altitude.<br />

B. Shop Drawings: Submit manufacturer's assembly-type shop drawings indicating<br />

dimensions, weight loadings, required clearances, and methods of assembly of<br />

components. Include manufacturer’s standard pump and motor balance (vibration)<br />

criteria.<br />

C. Wiring Diagrams: Submit manufacturer's electrical requirements for power supply wiring<br />

to HVAC pumps. Submit manufacturer's ladder-type wiring diagrams for interlock and<br />

control wiring. Diagrams shall clearly differentiate between portions of wiring that are<br />

factory-installed and portions to be field-installed.<br />

D. Record Drawings: At project closeout, submit record drawings of installed systems<br />

products in accordance with requirements of Division 23.<br />

E. Maintenance Data: Submit maintenance data and parts lists for each type of pump,<br />

control, and accessory, including "trouble-shooting" maintenance guide. Include this data,<br />

product data, shop drawings, and wiring diagrams in the Operating and Maintenance<br />

Manual, in accordance with requirements of Division 23.<br />

1.04 PRODUCT DELIVERY, STORAGE, AND HANDLING:<br />

A. Handle HVAC pumps and components carefully to prevent damage, breaking denting and<br />

scoring. Do not install damaged HVAC pumps or components; replace with new.<br />

B. Store HVAC pumps and components in a clean, dry place. Protect from weather, dirt,<br />

fumes, water, construction debris, and physical damage.<br />

C. Comply with Manufacturer's rigging and installation instructions for unloading HVAC<br />

pumps and moving them to final location.<br />

PART 2 – PRODUCTS<br />

2.01 MANUFACTURERS:<br />

A. Manufacturer: Subject to compliance with requirements, provide products by one of the<br />

following in each applicable category:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 2123 - 2 HYDRONIC PUMPS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!