Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

Exception: Concrete inertia bases for mechanical equipment.<br />

C. Temporary heat will be provided by the General Contractor. Use of the permanent<br />

heating system will not be allowed without written authorization.<br />

D. Lintels over wall openings.<br />

E. Cutting and patching of new and existing work.<br />

F. Temporary water and toilet facilities will be provided by the General Contractor.<br />

1.04 PREPURCHASED EQUIPMENT:<br />

A. The Owner has prepurchased certain items of equipment as indicated on the drawings<br />

and specified in this Division. It shall be the responsibility of the contractor to include in<br />

his bid his costs for state and local taxes, rigging and installation of equipment and all<br />

accessories, piping connections to equipment, isolation (if required), installation of motors<br />

where required, and any other items required which are not furnished with equipment and<br />

are necessary for a complete and operable system.<br />

B. All responsibility for the above equipment as outlined in Division 23 will be assigned to the<br />

successful bidder, including, but not limited to, start-up, training for operating personnel,<br />

administration of warranties provided by equipment supplier, etc.<br />

1.05 EXAMINATION OF SITE:<br />

A. The contractor shall visit and examine the premises and/or job site so as to ascertain, prior<br />

to bidding, the existing conditions in which he will be obliged to operate in performing his<br />

part of the contract. No extras will be allowed due to lack of knowledge of these<br />

conditions.<br />

B. Field verify all existing conditions prior to submitting bids.<br />

C. Report any existing damaged equipment or systems to the Owner prior to any work.<br />

1.06 ACCESSIBILITY:<br />

A. Install all equipment and materials in such a manner as to provide required access for<br />

servicing and maintenance. Coordinate the final location of concealed equipment and<br />

devices requiring access with final location of required access panels and doors. Allow<br />

ample space for removal of all parts that require replacement or servicing. In the event<br />

that changes of indicated locations and arrangements are deemed necessary by the<br />

Architect/Engineer, they shall be made by the Contractor without additional charges,<br />

provided the change is ordered before work is performed and no extra materials are<br />

required.<br />

B. Extend all grease fittings to an accessible location.<br />

C. Furnish hinged steel access doors with concealed latch, whether shown on drawings or<br />

not, in all walls and ceilings where required for access to all concealed valves, shock<br />

absorbers, air vents, motors, fans, balancing cocks, and other operating devices requiring<br />

adjustment or servicing.<br />

23 0010 - 2 BASIC MECHANICAL REQUIREMENTS