25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PART 1 - GENERAL<br />

1.1 SUMMARY<br />

A. Section Includes:<br />

1. Ceramic tile.<br />

2. Stone thresholds.<br />

3. Crack isolation membrane.<br />

4. Metal edge strips.<br />

B. Related Sections:<br />

SECTION 09 3000<br />

TILING<br />

1. Division 09 Section "Gypsum Board" for cementitious tile backer units.<br />

1.2 DEFINITIONS<br />

A. General: Definitions in the ANSI A108 series of tile installation standards and in<br />

ANSI A137.1 apply to Work of this Section unless otherwise specified.<br />

B. Module Size: Actual tile size plus joint width indicated.<br />

C. Face Size: Actual tile size, excluding spacer lugs.<br />

1.3 PERFORMANCE REQUIREMENTS<br />

A. Static Coefficient of Friction: For tile installed on walkway surfaces, provide products<br />

with the following values as determined by testing identical products per ASTM C 1028:<br />

Minimum 0.6.<br />

1.4 SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Samples for Initial Selection: For each type of tile and grout indicated. Include<br />

Samples of accessories involving color selection.<br />

C. Qualification Data: For qualified Installer.<br />

D. Product Certificates: For each type of product, signed by product manufacturer.<br />

Project No.: 10145 TILING<br />

550 15th Street Dual Brand Hotel 093000 - 1<br />

19 March 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!