25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A. Handling Flammable Liquids: Remove and legally dispose of liquid from a drip in existing<br />

gas piping and handle cautiously to avoid spillage or ignition. Notify the gas supplier.<br />

Handle flammable liquids used by the installer with proper precautions, and do not leave<br />

on the premises from the end of one working day to the beginning of the next.<br />

1.06 SEQUENCING AND SCHEDULING:<br />

A. Notification of Interruption of Service: Except in the case of an emergency, notify all<br />

affected users when the gas supply is to be turned off.<br />

B. Work Interruptions: When interruptions in work occur while repairs or alterations are<br />

being made to an existing piping system, leave the system in safe condition.<br />

C. Coordinate the installation of pipe sleeves for foundation wall penetrations.<br />

1.07 EXTRA MATERIALS:<br />

A. Valve Wrenches: Furnish to Owner, with receipt, two (2) valve wrenches for each type of<br />

gas valve installed, requiring same.<br />

PART 2 – PRODUCTS<br />

2.01 MANUFACTURERS:<br />

A. Manufacturer: Subject to compliance with requirements, provide products by one of the<br />

following:<br />

1. Gas Cocks:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

a. Jenkins Bros.<br />

b. Lunkenheimer Co.<br />

c. Nibco, Inc.<br />

d. Powell Co.<br />

e. Stockham.<br />

2.02 PIPE, TUBING AND JOINTING MATERIALS:<br />

A. Provide pipes and pipe fitting complying with Division 23, Section 232113.<br />

2.03 NATURAL GAS PIPING SPECIALTIES:<br />

A. Gas Meters: Diaphragm-type, positive displacement gas meters with aluminum cases,<br />

temperature compensated, with internal corrosion-resistant components; threaded ends<br />

for 2 inch and smaller, flanged ends for 2-1/2 inch and larger; for gas working pressures,<br />

specific gravity, and volume flow indicated.<br />

B. Protective Coating: Provide factory applied polyethylene tape, having the following<br />

properties:<br />

23 1123 - 3 FACILITY NATURAL-GAS PIPING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!