C. Clean and dry ductwork prior to insulating. Butt insulation joints firmly together to ensure<br />

complete and tight fit over surfaces to be covered.<br />

D. Maintain integrity of vapor barrier on ductwork insulation, and protect to prevent puncture<br />

and other damage.<br />

1. Avoid the use of staples on vapor barrier jackets.<br />

2. Seal vapor barrier penetrations with vapor barrier tape recommended by the<br />

manufacturer.<br />

E. Extend ductwork insulation without interruption through walls, floors and similar ductwork<br />

penetrations, except where otherwise indicated.<br />

F. Flexible Fiberglass Insulation: Cut back insulation to provide a 2” facing overlap at all<br />

seams. Seams shall be stapled at approximately 6” on centers with outward clinching<br />

staples, then sealed with pressure-sensitive tape matching the facing and designed for use<br />

with duct insulation. Insulation on the underside of ductwork 24” and wider shall be<br />

secured with mechanical fasteners and speed clips spaced approximately 18” on centers.<br />

The protruding ends of the fasteners shall be cut off flush after the speed clips are<br />

installed, and then sealed with the same tape as specified above.<br />

G. Corner Angles: Except for oven and kitchen hood exhaust duct insulation, install corner<br />

angles on all external corners of insulation on ductwork in exposed finished spaces before<br />

covering with jacketing.<br />

H. Calcium Silicate Insulation:<br />

1. Secure 3/4" high rib lath by wire on 16” centers with ribs turned to create 3/4” air<br />

space. Secure metal lath to outstanding ribs by welding or wire on 16” centers to<br />

serve as insulation base. Secure insulation to metal lath with 14-gauge<br />

galvanized wire ties on 16” centers. Stretch 1” hexagonal, 20-gauge mesh<br />

smoothly and securely over insulation. Apply 1/2” thick coat of insulating and<br />

finishing cement to exterior surface, and finish smooth. Allow cement to dry, and<br />

cover with 8-oz. canvas applied with lagging adhesive. Brush with one final coat<br />

of lagging adhesive.<br />

I. Installation of external insulation for ductwork exposed to weather:<br />

1. All insulation shall be applied with edges tightly butted and fastened to the duct<br />

with mechanical fasteners spaced on 12” to 18” centers or as required to hold<br />

insulation firmly against the duct surface. Insulation shall be tightly secured in<br />

place with washers firmly embedded in the insulation.<br />

2. Apply a heavy brush or trowel coat of weatherproof, fire-retardant, vapor barrier<br />

mastic to completely seal all joints and extend over adjacent insulation. Embed<br />

glass cloth into wet mastic to ensure complete and uniform contact, smoothing out<br />

all wrinkles. Immediately apply a second coat of weatherproof fire-retardant<br />

vapor barrier mastic over entire membrane surface, leaving a large bead over all<br />

joints.<br />

3.07 INSTALLATION OF EQUIPMENT INSULATION:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 0713 - 10 MECHANICAL INSULATION