3.06 VALVE APPLICATIONS:<br />

A. General: The Drawings indicate valve types, locations, and arrangements.<br />

B. General Duty Valve Applications: The Drawings indicate valve types to be used. Where<br />

specific valve types are not indicated the following requirements apply:<br />

1. Shut-off duty: Use gate valves<br />

2. Throttling duty: Use globe valves<br />

3.07 VALVE INSTALLATIONS:<br />

A. Install valves in accessible locations, protected from physical damage. Tag valves with a<br />

metal tag attached with a metal chain indicating the piping systems supplied.<br />

B. Install shut-off duty valves at each branch connection to supply mains, and elsewhere as<br />

indicated.<br />

C. Install drain valves at low points in mains, risers, branch lines, and elsewhere as required<br />

for system drainage.<br />

D. Install swing check valves as required to control flow direction.<br />

3.08 TERMINAL EQUIPMENT CONNECTIONS:<br />

A. Sediment Traps: Install a tee fitting with the bottom outlet plugged or capped as close to<br />

the inlet of the oil burning appliance as practical. Drip leg shall be a minimum of 3 pipe<br />

diameters in length.<br />

3.09 FIELD QUALITY CONTROL:<br />

A. Test oil piping in accordance with NFPA 31.<br />

B. Remake leaking joints and connections using new materials.<br />

3.10 COMMISSIONING:<br />

A. Test and adjust controls and safeties. Replace damaged or malfunctioning controls and<br />

equipment.<br />

B. Train Owner's maintenance personnel on procedures and schedules related to start-up<br />

and shut-down, troubleshooting, servicing, and preventative maintenance.<br />

C. Review data in Operating and Maintenance Manuals. Refer to Division 1 section 11<br />

Project Closeout."<br />

D. Schedule training with owner through the Architect, with at least 7 days advance notice.<br />

E. Before activating system perform these steps:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 1113 - 11 FACILITY FUEL-OIL PIPING