E. Plates<br />

2. Studded Port Connections. Unless otherwise specified, all plate type heat exchangers with<br />

connections of greater than 2" shall be equipped with studded port type connections with<br />

the following requirements:<br />

a. Each connection shall be equipped with a liner which prevents the process fluids<br />

from coming in contact with the covers.<br />

b. Liners shall be fabricated from materials which are compatible with the process<br />

fluids (generally the same materials as the plate/gaskets).<br />

1. Individual plates shall be pressed from a single metal sheet in one step. No multistage<br />

pressing of one sheet is allowed. Plate inspection shall be performed during production to<br />

ensure uniformity of pressing depth and absence of defects.<br />

2. All plates shall be permanently marked to identify plate material, thickness, raw plate<br />

supplier and heat numbers.<br />

3. The plates should include the following:<br />

F. Gaskets<br />

a. Bridge Zone - The area that connects the port to the distribution area.<br />

b. Drainage Chamber - The area vented to the atmosphere to prevent fluid<br />

interleakage. The drainage chamber should include a drainage channel.<br />

c. Distribution Zone - The top and bottom areas responsible for distributing the fluid<br />

d. The design of plates shall be such that each plate channel can withstand the Design<br />

Pressure with no pressure on the adjacent plate channels (Full Differential Pressure).<br />

e. Plate design shall allow and require plate-to-plate contact for structural integrity and<br />

elimination of vibration.<br />

f. End plates shall be provided and sufficiently gasketed at the fixed and movable<br />

covers to prevent hot and cold medium from coming in contact with these covers.<br />

g. Gasket grooves in the plates shall be designed to contain the gaskets while allowing<br />

for thermal expansion.<br />

h. The Suspension and Guidance method should support the plates uniformly and<br />

should mechanically align the plates during tightening. This area should be<br />

reinforced for all plates greater than 50" in height.<br />

1. Gaskets shall have relieving grooves in the leakage chamber zone to prevent intermixing<br />

of fluids and to cause any leak to be visually evident at the external surface of the plate<br />

pack.<br />

2. One piece molded gaskets are required for all fluid sealing areas.<br />

3. Mixing of gasket materials within fully gasketed units is not preferable.<br />

4. The sealing system should only be used for sealing and not for alignment. Preference shall<br />

be given to non-glued gasketing systems.<br />

5. If an adhesive is used, it shall be compatible with the gasket material and the process<br />

fluids. The standard adhesive shall be a 2 component epoxy glue and heat cured.<br />

2.4 INSPECTION AND TESTING<br />

A. Hydrostatic test shall be in accordance with ASME Section VIII Division 1, paragraph UG-99.<br />

Project No.: 10145<br />

550 15th Street Dual Brand Hotel<br />

03/16/2012<br />

23 5700 - 5 HEAT EXCHANGERS FOR HVAC