PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Examine substrates areas and conditions for compliance with requirements for<br />

installation tolerances, manufacturer’s requirements and other conditions affecting<br />

performance of the Work.<br />

B. Verify concrete slabs are dry according to ASTM F 1869 with maximum moisture<br />

emission rate of 5 pounds per 1000 SF per 24 hours. Do not install flooring with high<br />

alkaline content.<br />

C. Proceed with installation only after unsatisfactory conditions have been corrected.<br />

3.2 INSTALLATION<br />

A. Install flooring planks in accordance with manufacturer’s written installation<br />

instructions.<br />

3.3 PROTECTION<br />

A. Cover installed flooring to protect from damage or during remainder of construction<br />

period. Use heavy kraft-paper or other suitable covering.<br />

B. Maintain flooring in compliance with Manufacturer’s Maintenance Guidelines.<br />

END OF SECTION 09 6219<br />

Project No.: 10145 DECORATIVE LAMINATE FLOORING<br />

550 15th Street Dual Brand Hotel 096219 - 3<br />

19 March 2012