1.16 MATERIALS AND MANUFACTURERS:<br />

A. Certain materials and/or equipment in this specification are specified by manufacturer and<br />

catalog numbers. The design is based on the specified equipment, which establishes a<br />

standard of quality, performance, physical configuration, etc. If the Contractor should<br />

elect to use equipment other than the equipment specified and used as a basis for design,<br />

but is listed as "acceptable" in the specifications, he shall be responsible for space requirements,<br />

configuration, changes in performance, bases, supports, vibration isolators,<br />

structural members, openings in structure, and effects on other apparatus due to its use.<br />

B. Contractor further agrees that if deviations, discrepancies, or conflicts between reviewed<br />

submittals and/or shop drawings and the contract documents (design drawings and specifications)<br />

are discovered after submittals and/or shop drawings are processed by the<br />

Contracting Officer, the design drawings and/or specifications shall control and shall be<br />

followed unless modified by addenda or change order.<br />

C. Where no specific manufacturer is listed, a first-class item of cataloged manufacture shall<br />

be furnished.<br />

1.17 INSTALLATION:<br />

A. All materials and equipment shall be new, free of defects, and installed in accordance with<br />

manufacturer’s current published recommendations in a neat manner and in accordance<br />

with standard practice of the Industry. Maintain maximum headroom and space<br />

conditions at all points.<br />

1.18 SUBSTITUTION APPROVALS:<br />

A. Equipment and/or materials manufactured by any one of the manufacturers listed in this<br />

specification or on the drawings shall be acceptable.<br />

B. Approval Prior to Bidding: Materials or equipment specified by manufacturer’s name is<br />

used as a basis of standard. Materials of equal quality may be used if approved prior to<br />

bidding. Requests for approval shall be received at the Architect/Engineer’s office at least<br />

ten (10) calendar days before bid opening.<br />

C. Substitution Requests after Execution of Contract: If Contractor wishes to furnish or use a<br />

substitute item of material and/or equipment after execution of the contract, he must<br />

submit a change order <strong>request</strong> to the Architect/Engineer. The <strong>request</strong> for change order<br />

shall itemize each of the proposed <strong>substitution</strong>s identified by applicable specification<br />

section, paragraph number and/or drawing number. A price change (increase or<br />

decrease) shall be listed for each item along with compete data showing performance over<br />

entire range, physical dimensions, electrical characteristics, material construction,<br />

operating weight and other applicable data. The change order <strong>request</strong> will be reviewed<br />

for equality, suitability and reasonableness of price differential. A single <strong>substitution</strong><br />

change order listing the approved items will be issued, with the net cost of the change<br />

order being the sum of the approved item costs less the sum of the corresponding<br />

specified item costs. No subsequent <strong>substitution</strong> change orders will be considered. The<br />

Architect/Engineer’s decision will be final.<br />

D. It shall be the responsibility of the Contractor to ensure that the substitute material and/or<br />

equipment fits into the space provided. The Contactor shall pay for all extra costs incurred<br />

by other trades for any and all changes necessitated by these <strong>substitution</strong>s.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 0010 - 8 BASIC MECHANICAL REQUIREMENTS