25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

3.04 ADJUSTING AND CLEANING:<br />

A. Adjusting: Adjust ductwork accessories for proper settings. Install fusible links in fire<br />

dampers and adjust for proper action.<br />

B. Label access doors in accordance with Division 15 section "Mechanical Identification.”<br />

C. Final positioning of manual dampers is specified in Division 15 section "Testing, Adjusting,<br />

and Balancing."<br />

D. Cleaning: Clean factory-finished surfaces. Repair any marred or scratched surfaces with<br />

manufacturer's touch-up paint.<br />

3.05 EXTRA STOCK:<br />

A. Furnish extra fusible links to Owner, one link for every 10 installed of each temperature<br />

range; obtain receipt.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 23 3300<br />

23 3300 - 10 AIR DUCT ACCESSORIES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!