25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 2 - PRODUCTS<br />

2.1 RESILIENT BASE<br />

A. Products as indicated on Interior Design Drawings.<br />

B. Outside Corners: Preformed.<br />

C. Inside Corners: Job formed or preformed.<br />

PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Examine substrates, with Installer present, for compliance with requirements for<br />

maximum moisture content and other conditions affecting performance of the Work.<br />

B. Verify that finishes of substrates comply with tolerances and other requirements<br />

specified in other Sections and that substrates are free of cracks, ridges, depressions,<br />

scale, and foreign deposits that might interfere with adhesion of resilient products.<br />

C. Proceed with installation only after unsatisfactory conditions have been corrected.<br />

3.2 PREPARATION<br />

A. Prepare substrates according to manufacturer's written instructions to ensure adhesion<br />

of resilient products.<br />

END OF SECTION 09 6513<br />

Project No.: 10145 RESILIENT BASE AND ACCESSORIES<br />

550 15th Street Dual Brand Hotel 096513 - 2<br />

19 March 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!